| Location: | Connecticut |
|---|---|
| Posted: | Aug 28, 2025 |
| Due: | Sep 25, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2026.0114 |
| Publication URL: | To access bid details, please log in. |
2026.0114, City Bid - HVAC Upgrades Phase II at the Ferguson Library DiMattia Building (Main Library) Bid Opening: September 25, 2025 at 11:00 AM Project is funded in whole or in part with ARP funds Bid Deposit: 5% Mandatory Pre-Bid Meeting: September 4, 2025 at 10:00 AM. Meet at the front of the library, located at 1 Public Library Plaza, Stamford, CT 06901 Project Manager: Josh Noggle, Building Systems Engineer All Proposal and Bid documents, drawings and specifications can be viewed/ downloaded from ProcureWare ( https://stamfordct.procureware.com). For questions regarding the purchasing or bidding procedures, call or email Erik J. Larson, Purchasing Agent at (203) 977-4107 or elarson@stamfordct.gov.
Kristopher Bottoni 888 Washington Blvd. Stamford CT, 06901 United States Tel: 203-977-4108 Fax: kbottoni@stamfordct.gov

With GovernmentContracts, you can:
...for the removal of existing forced hot air furnaces and the installation of ...
State Government of Connecticut
Bid Due: 7/02/2026
...-Fired Unit Heaters and Replacement of Existing Forced Hot Air Furnaces...
Town of Ridgefield, Connecticut
Bid Due: 7/02/2026
...) Installation of Gas-Fired Unit Heaters and Replacement of Existing Forced Hot Air ...
Town of Ridgefield, Connecticut
Bid Due: 7/02/2026