Title: FM 1626 Transmission Main Pipeline
Addenda: 3
Release Date: 3/16/2026
Due Date: 4/23/2026
The Work consists of the installation of approximately 1.2 miles (6,300 LF) of 30-inch and 24-inch PVC pipe extending between the City’s FM1626 Pump Station site to the Well 4 Site along TXDOT and City right-of-way. Additionally, the Work includes a 16-inch and 12-inch PVC pipe across Benner Rd. to connect the Well 4 Site to the City’s water distribution system. Work will also include the installation of all necessary valving along the transmission line and several trenchless crossings under roadways.

With GovernmentContracts, you can:
...Project: PW - CPN 100997-1 - Sanitary Sewer M-245 Parallel Relief Pipeline Part ...
City of Fort Worth
Bid Due: 7/16/2026
...Engineering Design Services for WMP Project #4 24-inch Water Pipeline along State Highway ...
City of Irving
Bid Due: 6/12/2026
...residuals bypass pipeline, mechanical upgrades to the Sludge Pump Station, installation of variable...
City of Dallas
Bid Due: 7/10/2026
...Invitation To Bid Operations- Pipeline 00500 , 01000 , 03105 , 03114 , ...
Tarrant Regional Water District
Bid Due: 6/12/2026