| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66850-NONST-2025-000000008 | Amphitheater & Front Street Parking Lot | Cornelia, City Of |
Nov 27, 2024 @ 10:21 AM
|
Dec 31, 2024 @ 11:00 AM
|
Start Date: Nov 27, 2024 @ 10:21 AM ET
End Date:
Dec 31, 2024 @ 11:00 AM ET
Sealed bids for construction of the Amphitheater & Front St. Parking Lot will be received until the closing time of December 31, 2024 at 11:00 AM local time. Bids must be submitted by the Bidder electronically through QuestCDN.com. No paper submissions will be accepted. Any bid received after the bid closing time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically provided in the Instructions to Bidders and/or by State law. Base Cost of all Bids will be posted by the Owner/Engineer to the QuestCDN website within approximately 30 minutes after the bid closing time. This project is covered under the requirements of Section 3 of the HUD Act of 1968. The work to be completed shall consist of furnishing all labor, material, and equipment to complete grading and install associated paving, restroom structures, concrete sidewalk, curb and gutter, concrete slabs, storm infrastructure, fencing including, but not limited to storm structures, pavement replacement, earthwork, landscaping, signage, striping, grassing, soil erosion and sedimentation control measures, and appurtenances necessary to provide a complete installation. See Section 01014 for critical construction constraints. Some demolition as well as water, sewer, and power infrastructure will be installed by others. Time allotted for completion of work is 270 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. Complete digital specifications and contract documents are available at www.cartersloope.com/outforbid. Bidders may also view the digital plan documents for free by creating a Quest account and entering the Quest project number 9290323 on the website¿s project search page. Bidders can download the digital documents for a fee of $100 payable through the website.
| Code | Description |
| 91345 | Construction, Sewer and Storm Drain |
| 91394 | Paving and Resurfacing, Alley and Parking Lot |
| 91347 | Construction, Sidewalk and Driveway, Including Pedestrian and Handicap Ramps |
| 98832 | Grading, Parking Lots, etc., Not Road Building |
| 91223 | Construction, General: Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc. |
Dee Anderson
dee@corneliageorgia.org
706-778-8585

With GovernmentContracts, you can:
...miles of clearing & grubbing, grading, sidewalk, and curb & gutter. * Earthwork ...
Gwinnett County
Bid Due: 6/25/2026
...to fire hydrants, valves, manholes, storm structures, pavement replacement, earthwork, grassing, soil...
State Government of Georgia
Bid Due: 6/25/2026
.... * Earthwork 1,500 CY * Curb & Gutter 1,654 LF * Concrete ...
Gwinnett County
Bid Due: 6/25/2026
..., sidewalk, and curb & gutter. * Earthwork 300 CY * Curb & ...
Gwinnett County