Professional Engineering Services for Buckman Direct Diversion Facility

Location: New Mexico
Posted: May 7, 2026
Due: Jun 12, 2026
Agency: City of Santa Fe
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • R - Professional, Administrative and Management Support Services
Publication URL: To access bid details, please log in.


Project ID:

Title: Professional Engineering Services for Buckman Direct Diversion Facility

Addenda: 0

Release Date: 5/7/2026

Due Date: 6/12/2026

Follow
Professional Engineering Services for Buckman Direct Diversion Facility
Request For Qualifications
Buckman Direct Diversion
91107 , 92500 , 92597
Project ID: FY26-TRFQP - A&E-094
Release Date: Thursday, May 7, 2026
· Due Date: Friday, June 12, 2026 3:00pm
Posted Thursday, May 7, 2026 5:14pm
All dates & times in Mountain Time
Draft Response Events RSVP No Bid35 days, 19 hours, 48 minutes


Post Information

Posted At:Thu, May 7, 2026 5:14 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

The purpose of this Request for Qualifications (“RFQ”) is to solicit Statements of Qualifications (“SOQ” or “SOQs”) from a qualified Offeror interested in providing Professional Engineering Services for the redesign and reconstruction of portions of the Buckman Direct Diversion Facility (Facility) intake and raw water pumping facilities. This RFQ is being issued by the City of Santa Fe (City) on behalf of the Buckman Direct Diversion Board (Board).



Background

The Facility is a diversion and treatment plant on the Rio Grande River near Santa Fe, New Mexico. The point of diversion is approximately 15 miles northwest of the City of Santa Fe and is located about three miles from the confluence of the Rio Grande River and Los Alamos Canyon.

The Facility was intended to operate in this fashion:

  • Raw water is pulled from the Rio Grande diversion site.
  • Sediment is removed near the diversion site through Lakos separators.
  • Water is pumped uphill (1,100 vertical feet through 11 miles of 30” raw water pipe and three pump stations).
  • The water is filtered and purified at an advanced treatment plant.
  • Drinking water is then pumped to the utility providers.
  • The illustration of the major systems in the process train are uploaded in the Vendor Questionnaire #18

The Board was created pursuant to a Joint Powers of Agreement between the City and Santa Fe County, effective March 11, 2005. The Board oversees the management and operations of the Facility. The Board is made up of two City Councilors, two County Commissioners, an At Large Citizen member, an Alternate Citizen member, and two non-voting representatives from the Las Campanas Community.

Under the Joint Powers Agreement for the Facility, the Board is responsible for diverting, treating, and transmitting surface water in accordance with respective diversion allocations and delivery demands.

The planning and design of the Facility began in 2001 and the Facility became operational in 2011. The Facility was expected by the Board to provide the necessary robust diversion, treatment, and reliable operations to meet much of the water demands of the City and the County for the foreseeable future. The Facility was intended to be able to divert, convey, and treat varying daily and monthly water diversion volumes, depending on water demands and source water availability. A maximum daily diversion of 20.8 MGD (32.2 CFS) at the river and 15 MGD net at the treatment plant could be needed at any time throughout the year.

The Facility does not currently operate or perform as anticipated or desired, due to a number of issues. Many of the issues can be attributed to the Facility’s inability to adequately address extensive seasonal and precipitation triggered fluctuations in sediment and turbidity conditions in the Rio Grande. To improve the Facility’s performance and operation, the Board anticipates that design and construction of a new intake facility to exclude sediment from entering the intake will be a first step priority, coupled with improvements to the sediment removal process.

The Facility is the foundation of a resilient water future for the partners and as such a permanent solution must be achieved.



Timeline

Issue RFP:
May 7, 2026
Pre-Proposal Meeting (Mandatory):
Site Visit (Mandatory):
May 19, 2026, 10:00am
341 Caja Del Rio Road
Deadline for Written Questions:
May 22, 2026, 5:00pm
Response to Written Questions:
May 26, 2026, 5:00pm
Proposals Due Date:
June 12, 2026, 3:00pm
Evaluation*:
June 15, 2026, 10:00am
Oral Presentations*:
June 23, 2026, 10:00am
Selection of Finalists*:
June 30, 2026
Finalize Contracts*:
July 9, 2026
Contract Award*:
July 31, 2026
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Services Hazardous Waste (Incl. Site Management),Construction Energy Related (All Types... AM Teams Commodity ...

State Government of New Mexico

Bid Due: 7/06/2026

...will include the engineering and project management services normally required for City facilities... ...

City of Rio Rancho

Bid Due: 6/18/2026

...,Construction Services General (Incl. Maintenance And Repair Services),Consulting Services,Engineering... Area Services Commodity Description ...

State Government of New Mexico

Bid Due: 6/18/2026

...Small Business Set-Aside (FAR 19.5) Product Service Code: Y1DA - CONSTRUCTION OF HOSPITALS ...

HEALTH AND HUMAN SERVICES, DEPARTMENT OF

Bid Due: 6/22/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.