| Location: | Pennsylvania |
|---|---|
| Posted: | May 7, 2026 |
| Due: | Jun 3, 2026 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | East Norriton Township, Montgomery County |
| Publication URL: | To access bid details, please log in. |
Project Description: East Norriton Township is executing a stormwater improvement project at Heroes Park, formally known as Calvert Hurdle Park. In general, the work consists of, but is not limited to, demolition of portions of the existing stormwater infrastructure, installation of a new detention basin including site grading, permanent stabilization matting, and basin bottom seed mix, as well as the installation of new drainage structures, installation of new storm pipes, installation of a new split rail fence and gates, and associated incidental work.

With GovernmentContracts, you can:
...sewer pipe along Bell Tavern Boulevard utilizing cured-in-place pipe (CIPP) lining systems..., including ...
PennBid
Bid Due: 6/11/2026
.... The project consists of the installation of 18-inch High-Density Polyethylene (HDPE) storm ...
PennBid
Bid Due: 6/17/2026
...DRAINAGE PIPE NORTHEAST WINGWALL AND ABUTMENT INTERFACES. INSTALL JOINT SEALING MATERIAL AT...
Montgomery County
Bid Due: 7/02/2026
..., equipment and materials to complete the installation of 131 LF of 18 ...
Township of Upper Providence
Bid Due: 6/10/2026