| Location: | Georgia |
|---|---|
| Posted: | Nov 1, 2024 |
| Due: | Dec 4, 2024 |
| Agency: | Cobb County School District |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | B25025 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project consist of, but is not limited to, the replacement of the existing HVAC system to improve the conditioned air in the existing Kitchen Area and auxiliary spaces (office, locker room, toilet, dry storage); the installation of a new utility distribution system; the replacement of the existing ventilation hood; the replacement of the existing cooler & freezer (floor, wall, and ceiling panels, evaporators, condensers, lighting, refrigerant piping, controls, and dry pipe sprinkler system); replacement of the interior lighting; and replacement of the acoustical ceiling and suspension system.

With GovernmentContracts, you can:
...Jun 10 2026 Bid Calendar WALK-IN FREEZER for HEPHZIBAH MIDDLE; RFP#26-207 3 : ...
Richmond County School District
Bid Due: 6/10/2026
...Jun 10 2026 Bid Calendar WALK-IN FREEZER for HEPHZIBAH MIDDLE; RFP#26-207; ADDENDUM #1 ...
Richmond County School District
Bid Due: 6/10/2026
...Jun 10 2026 Bid Calendar WALK-IN FREEZER for HEPHZIBAH MIDDLE; RFP#26-207; ADDENDUM #2 ...
Richmond County School District
Bid Due: 6/10/2026
...replacement, flooring replacement, freezer/cooler replacement, HVAC replacement, and ceiling replacement associated with the ...
Cobb County School District
Bid Due: 7/14/2026