| Location: | Georgia |
|---|---|
| Posted: | Nov 1, 2024 |
| Due: | Dec 4, 2024 |
| Agency: | Cobb County School District |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | B25025 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project consist of, but is not limited to, the replacement of the existing HVAC system to improve the conditioned air in the existing Kitchen Area and auxiliary spaces (office, locker room, toilet, dry storage); the installation of a new utility distribution system; the replacement of the existing ventilation hood; the replacement of the existing cooler & freezer (floor, wall, and ceiling panels, evaporators, condensers, lighting, refrigerant piping, controls, and dry pipe sprinkler system); replacement of the interior lighting; and replacement of the acoustical ceiling and suspension system.

With GovernmentContracts, you can:
...Biological Sciences Field House Condenser Replacements Georgia Southern University Sep 15, 2026 @ ...
State Government of Georgia
Bid Due: 11/06/2026
...enlargement and the relocation of the condensers from the roof to the sidewalk....
Cobb County School District
Bid Due: 10/15/2026
...enlargement and the relocation of the condensers from the roof to the sidewalk. ...
State Government of Georgia
Bid Due: 10/15/2026