Fuel Island Canopy Construction

Location: Colorado
Posted: Aug 13, 2026
Due: Sep 3, 2026
Agency: San Miguel County
Type of Government: State & Local
Category:
  • 91 - Fuels, Lubricants, Oils, and Waxes
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.
Bid Title: Fuel Island Canopy Construction
Category: Road & Bridge
Status: Open
Description:
Request for Proposals (RFP) for San Miguel County Fuel Island Canopy Construction Norwood Road and Bridge Maintenance Yard


Request for proposal issued: 8/12/2026 Responses due: 9/3/2026


333 W. Colorado Avenue

P.O. Box 1170

Telluride, CO 81435


1. Request for Proposal

San Miguel County Road and Bridge is requesting proposals from qualified contractors for

the design, engineering, permitting assistance, and construction of a fuel island canopy at the

Norwood Road and Bridge Maintenance Yard, located at 39595 Highway 145, Norwood, CO

81423.

The selected contractor shall provide all labor, materials, equipment, engineering, and

supervision necessary to complete the project in accordance with the conceptual design and

applicable building codes.


2. Background

San Miguel County Road and Bridge is constructing a canopy over the fuel island at the

Norwood Maintenance Yard to protect fueling operations and equipment from the elements.

The County is seeking a qualified contractor to provide engineered plans and construct the

canopy in accordance with the conceptual design, structural requirements, and applicable

building codes.

Road and Bridge will assist with obtaining the required building permit; however, the

contractor will be responsible for scheduling all required inspections throughout

Construction.


3. Scope of Work and Deliverables

The contractor shall provide all labor, equipment, materials, engineering, and supervision

necessary to complete the project, including but not limited to:

• Provide plans showing the general site layout.

• Provide engineered structural drawings, including foundation design.

• Provide structural calculations including column loads, wind load ratings, and snow load

ratings.

• Perform excavation necessary to clear the construction area.

• Excavate for pier footings supporting the canopy columns.

• Furnish and install reinforced concrete piers with anchor bolts.

• Furnish, assemble, and erect structural support columns, beams, and framing.

• Furnish and install roof decking, roof panels, and perimeter fascia.

• Furnish and install roof drainage system.

• Clean and restore the work area upon completion.

• Coordinate and schedule all required building inspections.

• Construct the canopy in accordance with the conceptual design.

Additional Requirements:

• The project requires a building permit.

• Road and Bridge will assist with obtaining the required permits.

• No electrical service will be installed or connected to the canopy as part of this project.


4. Proposed Schedule

The County anticipates the project will proceed according to the milestone schedule identified in Section 5. Following issuance of the RFP, the County will conduct a pre-proposal onsite meeting and provide an opportunity for prospective proposers to submit questions. Proposals will be evaluated following the proposal deadline, with notification of selection anticipated on September 7, 2026. Contract execution will occur upon completion of all required documents. The selected contractor will begin work upon award and completion of the contract requirements. The project shall be completed no later than December 31, 2026.


5. Milestone Proposed Dates

• RFP Issued August 12, 2026

• Pre-Proposal Onsite meeting on August 24, 2026 at 10:00 am Mountain Time at the

Norwood Road & Bridge Maintenance Shop located at 39595 Hwy 145, Norwood, CO 81423.

• Questions Deadline August 26, 2026 at 5:00 pm Mountain Time

• Questions Response deadline, August 31, 2026 at 5:00 pm Mountain Time

• Proposal Due September 3, 2026 at 4:00 pm Mountain Time

• Notification of Selection (Tentative) September 7, 2026 at 5:00 pm Mountain Time

• Contract (Tentative) Dependent on Completion of Required Documents

• Project Kickoff Upon Award

• Project completion No later than December 31, 2026

All dates are subject to change at the discretion of the County.


6. Inquiries

Inquiries or questions on the contents and requirements of the RFP will be accepted in written electronic form only. Inquiries can be emailed to the attention of: Ryan Righetti to For security reasons, you must enable JavaScript to view this E-mail address. using the subject line ‘Fuel Island Canopy RFP”. The deadline for inquiries is August 26, 2026 at 5:00 pm Mountain Standard Time, after which no further inquiries will be addressed.

Substantive requests for information received may be responded to in writing by the County in the form of an addendum to this RFP and sent to all recipients of the RFP.


7. Proposal Requirements

Proposals must include clear descriptions of the contractor’s capabilities to perform the requirements of the RFP, including the following:

1. Design. Provide a proposed design for the fuel island canopy that meets the requirements of the RFP, conceptual design, applicable building codes, and structural requirements.

2. Fee Estimate. Please submit a fee estimate for the total project cost for requested Scope of Work and Deliverables, including each of the tasks outlined in the scope of work and the total number of hours expected. Also, provide a menu of pricing for scenarios and strategies.

3. Construction Schedule. Provide a proposed construction schedule identifying the anticipated duration and major milestones for the project. The schedule shall demonstrate the Contractor’s ability to complete the project no later than December 31, 2026.

4. Exceptions. Please include a statement regarding exceptions. If no exceptions are included, the County expects the Consultant will be able to sign the County’s contract and provide the required insurance and indemnification.


8. Proposal Submission

The proposals must be submitted by September 3, 2026 at 4:00 pm Mountain Time. Late proposals will not be accepted. It is the Consultant’s responsibility to see that the Proposal is received at the proper time. The County is not responsible for delayed deliveries due to connectivity problems. The time the proposal is logged as received in the County’s email system shall determine the official time received. Please submit an electronic copy of the proposal to the attention of: San Miguel County Road & Bridge Department at

For security reasons, you must enable JavaScript to view this E-mail address. with subject heading “RFP Response – Fuel Island CanopyConstruction.”


9. Agreement for Services

The contractor shall review and execute the Construction Agreement contract prior to beginning work. Upon award, this contract will define the project, the term and services to be performed. This is a legal-binding document between the contractor and San Miguel County. A draft Construction Agreement is attached for your review.


10. Selection Procedure and Evaluation Criteria

All proposals received by the submission deadline will be reviewed by San Miguel County for completeness and compliance with the requirements of this RFP. Proposals that are late or do not meet the minimum submission requirements may be deemed non-responsive and removed from consideration.

The County will evaluate proposals based on the proposed design, total project cost, construction schedule, and the Contractor’s demonstrated ability to successfully complete the scope of work within the required schedule and budget.

The County may, at its discretion, request clarification, additional information, or conduct interviews with one or more proposers to better understand proposed means, methods, and execution approach.

The County reserves the right to select the proposer that, in its judgment, offers the best overall value based on cost efficiency, constructability, and ability to successfully deliver the project.


11. Bidding Documents

RFP packages may be obtained by accessing the details on the San Miguel County website https://www.sanmiguelcountyco.gov/Bids.aspx or contacting Ashley Lamers at the Road and Bridge Department.


12. San Miguel County Contact Information

Please contact for any questions:

Road & Bridge Department

San Miguel County

1120 Summit Street

Norwood, CO 81423

Office phone: 970-327-4835

For security reasons, you must enable JavaScript to view this E-mail address.

Publication Date/Time:
8/13/2026 2:30 PM
Closing Date/Time:
Open Until Contracted
Related Documents:

Attachment Preview

Request for Proposals (RFP) for San Miguel County
Fuel Island Canopy Construction
Norwood Road and Bridge Maintenance Yard
Request for proposal issued: 8/12/2026
Responses due: 9/3/2026
333 W. Colorado Avenue
P.O. Box 1170
Telluride, CO 81435
1|Page
1. Request for Proposal
San Miguel County Road and Bridge is requesting proposals from qualified contractors for
the design, engineering, permitting assistance, and construction of a fuel island canopy at the
Norwood Road and Bridge Maintenance Yard, located at 39595 Highway 145, Norwood, CO
81423.
The selected contractor shall provide all labor, materials, equipment, engineering, and
supervision necessary to complete the project in accordance with the conceptual design and
applicable building codes.
2. Background
San Miguel County Road and Bridge is constructing a canopy over the fuel island at the
Norwood Maintenance Yard to protect fueling operations and equipment from the elements.
The County is seeking a qualified contractor to provide engineered plans and construct the
canopy in accordance with the conceptual design, structural requirements, and applicable
building codes.
Road and Bridge will assist with obtaining the required building permit; however, the
contractor will be responsible for scheduling all required inspections throughout
construction.
3. Scope of Work and Deliverables
The contractor shall provide all labor, equipment, materials, engineering, and supervision
necessary to complete the project, including but not limited to:
Provide plans showing the general site layout.
Provide engineered structural drawings, including foundation design.
Provide structural calculations including column loads, wind load ratings, and snow load
ratings.
Perform excavation necessary to clear the construction area.
Excavate for pier footings supporting the canopy columns.
Furnish and install reinforced concrete piers with anchor bolts.
Furnish, assemble, and erect structural support columns, beams, and framing.
Furnish and install roof decking, roof panels, and perimeter fascia.
2|Page
Furnish and install roof drainage system.
Clean and restore the work area upon completion.
Coordinate and schedule all required building inspections.
Construct the canopy in accordance with the conceptual design.
Additional Requirements:
The project requires a building permit.
Road and Bridge will assist with obtaining the required permits.
No electrical service will be installed or connected to the canopy as part of this project.
4. Proposed Schedule
The County anticipates the project will proceed according to the milestone schedule identified in
Section 5. Following issuance of the RFP, the County will conduct a pre-proposal onsite meeting
and provide an opportunity for prospective proposers to submit questions. Proposals will be
evaluated following the proposal deadline, with notification of selection anticipated on
September 7, 2026. Contract execution will occur upon completion of all required documents.
The selected contractor will begin work upon award and completion of the contract
requirements. The project shall be completed no later than December 31, 2026
5. Milestone Proposed Dates
RFP Issued August 12, 2026
Pre-Proposal Onsite meeting on August 24, 2026 at 10:00 am Mountain Time at the
Norwood Road & Bridge Maintenance Shop located at 39595 Hwy 145, Norwood, CO
81423.
Questions Deadline August 26, 2026 at 5:00 pm Mountain Time
Questions Response deadline, August 31, 2026 at 5:00 pm Mountain Time
Proposal Due September 3, 2026 at 4:00 pm Mountain Time
Notification of Selection (Tentative) September 7, 2026 at 5:00 pm Mountain Time
Contract (Tentative) Dependent on Completion of Required Documents
Project Kickoff Upon Award
Project completion No later than December 31, 2026
All dates are subject to change at the discretion of the County.
6. Inquiries
Inquiries or questions on the contents and requirements of the RFP will be accepted in written
electronic form only. Inquiries can be emailed to the attention of: Ryan Righetti to
3|Page
roadbridge@sanmiguelcountyco.gov using the subject line ‘Fuel Island Canopy RFP”. The
deadline for inquiries is August 26, 2026 at 5:00 pm Mountain Standard Time, after which no
further inquiries will be addressed.
Substantive requests for information received may be responded to in writing by the County in
the form of an addendum to this RFP and sent to all recipients of the RFP.
7. Proposal Requirements
Proposals must include clear descriptions of the contractor’s capabilities to perform the
requirements of the RFP, including the following:
1. Design. Provide a proposed design for the fuel island canopy that meets the requirements
of the RFP, conceptual design, applicable building codes, and structural requirements.
2. Fee Estimate. Please submit a fee estimate for the total project cost for requested Scope
of Work and Deliverables, including each of the tasks outlined in the scope of work and
the total number of hours expected. Also, provide a menu of pricing for scenarios and
strategies.
3. Construction Schedule. Provide a proposed construction schedule identifying the
anticipated duration and major milestones for the project. The schedule shall demonstrate
the Contractor’s ability to complete the project no later than December 31, 2026.
4. Exceptions. Please include a statement regarding exceptions. If no exceptions are
included, the County expects the Consultant will be able to sign the County’s contract
and provide the required insurance and indemnification.
8. Proposal Submission
The proposals must be submitted by September 3, 2026 at 4:00 pm Mountain Time. Late
proposals will not be accepted. It is the Consultant’s responsibility to see that the Proposal is
received at the proper time. The County is not responsible for delayed deliveries due to
connectivity problems. The time the proposal is logged as received in the County’s email system
shall determine the official time received. Please submit an electronic copy of the proposal to the
attention of: San Miguel County Road & Bridge Department at
roadbridge@sanmiguelcountyco.gov with subject heading “RFP Response – Fuel Island Canopy
Construction.”
9. Agreement for Services
The contractor shall review and execute the Construction Agreement contract prior to beginning
work. Upon award, this contract will define the project, the term and services to be performed.
This is a legal-binding document between the contractor and San Miguel County. A draft
Construction Agreement is attached for your review.
4|Page
10. Selection Procedure and Evaluation Criteria
All proposals received by the submission deadline will be reviewed by San Miguel County for
completeness and compliance with the requirements of this RFP. Proposals that are late or do not
meet the minimum submission requirements may be deemed non-responsive and removed from
consideration.
The County will evaluate proposals based on the proposed design, total project cost, construction
schedule, and the Contractor’s demonstrated ability to successfully complete the scope of work
within the required schedule and budget.
The County may, at its discretion, request clarification, additional information, or conduct
interviews with one or more proposers to better understand proposed means, methods, and
execution approach.
The County reserves the right to select the proposer that, in its judgment, offers the best overall
value based on cost efficiency, constructability, and ability to successfully deliver the project.
11. Bidding Documents
RFP packages may be obtained by accessing the details on the San Miguel County website
https://www.sanmiguelcountyco.gov/Bids.aspx or contacting Ashley Lamers at the Road and
Bridge Department.
12. San Miguel County Contact Information
Please contact for any questions:
Road & Bridge Department
San Miguel County
1120 Summit Street
Norwood, CO 81423
Office phone: (970)327-4835
roadbridge@sanmiguelcountyco.gov
13. Attachments
A. Construction Agreement Template
B. Conceptual Canopy Design
5|Page
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...system, to include a reinforced concrete foundation, deep footers, and structural steel I-beam ...

DEPT OF DEFENSE

Bid Due: 9/22/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.