London Projects FY25/26

Location: Ohio
Posted: Jan 28, 2026
Agency: Ohio Facility Construction Commission
Type of Contract: Awards
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
Solicitation No: AGO-250002
Publication URL: To access bid details, please log in.
Publish Date Due Date Number Owner Contractring Authority Project Name Primary Service Estimated Project Cost Q&A Short List Notes
9/23/2024 10/11/2024 AGO-250002 Ohio Attorney General OFCC London Projects FY25/26 A/E $11,714,477 Q&A *BDTAID*; Jerome M. Scott Architects; Legat Architects

Attachment Preview

Request for Qualifications (Architect / Engineer)
State of Ohio Standard Forms and Documents
Administration of Project: Ohio Facilities Construction Commission
Project Name London Projects FY25/26
Response Deadline 10/11/2024
2:00 pm local time
Project Location Varies
Project Number
AGO-250002
City / County London / Madison
Project Manager
Brett Woodring
Owner
Ohio Attorney General
Contracting Authority OFCC
Delivery Method CM at Risk
Prevailing Wages State
No. of paper copies requested (stapled, not bound)
0
No. of electronic copies requested (PDF)
1
Submit the requested number of Statements of Qualifications (Form F110-330) directly to OFCC Procurement at
procurement@ofcc.ohio.com . See Section J of this RFQ for additional submittal instructions.
Submit all questions regarding this RFQ in writing to OFCC Procurement at procurement@ofcc.ohio.com with the project
number included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page
on the OFCC website at http://ofcc.ohio.gov on a regular basis until one week before the response deadline. The name of the
party submitting a question will not be included on the Q&A document.
Project Overview
A. Project Description
The purpose of this Request for Qualifications (RFQ) is to obtain Professional, Architectural/Engineering (A/E) services for
the design of renovations and/or new work for three separate Ohio Attorney General facilities: Ohio Peace Officer Training
Academy (OPOTA) London Tactical Training Center / OPOTA London Main Campus / Bureau of Criminal Investigation
(BCI) London. These three facilities are located in London, Madison County. The scope of work for these projects
includes:
London BCI OPOTA HVAC Controls
Replacement of HVAC controls will allow an upgrade to current operations standards and the ability to control and
properly maintain temperature, humidity, and recommended air exchanges in the London Facilities.
London BCI Evidence Building
New evidence fee standing storage facility (approx. 6,700 SF) to address long term storage of DNA samples, long
term storage of evidence and current storage of crime scene supplies.
London TTC Outdoor Range Renovation
New covered shelter directly adjacent to the 125-yard outdoor gun range to protect approx. 25 officers, their
equipment and firearms from the elements when shooting at the range.
New multilevel platform at the 300-yard outdoor gun range to provide precision rifle and sniper training. Also, replace
existing shed with new enlarged storage building adjacent to the range platform.
London Renovations
Includes parking lot replacement(s), including but not limited to, asphalt paving, concrete sidewalks/aprons, exterior
stair replacement, concrete pads, curbs, and drain basins.
All aspects of the project and related issues will be implemented and operated consistently with Attorney General’s Office
and Bureau of Criminal Investigations policies and procedures.
The Owner or Contracting Authority may require the A/E to conduct background checks of its employees, agents,
representatives, and subcontractors that will be on-site during the term of the Project as directed by the Owner or
Contracting Authority. The cost of the background checks will be borne by the A/E. The Contracting Authority or Owner
may require the A/E to exclude the A/E’s employees, agents, representatives, or subcontractors based on the background
check results. Upon request of the Owner or Contracting Authority, the A/E will do a background check of its new
employees, agents, representatives, and subcontractors that will be on site during the term of the Contract.
F110-02-2022-MAR
Publish Date: 9/23/2024
Page 1 of 4
Request for Qualifications (Architect / Engineer)
State of Ohio Standard Forms and Documents
B. Scope of Services
Upon award of the Agreement, the selected Architect/Engineer (A/E) will commence by developing the Program of
Requirements (POR) with the owner.
The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and
clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed
cost components to address the Owner’s project requirements. Participate in the Encouraging Diversity, Growth & Equity
(EDGE) Program as required by statute and the Agreement.
As required by the Agreement, and as properly authorized, provide the following categories of services: Program
Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support,
Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types.
Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required
for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov.
During the construction period, provide not less than 12 hours (excluding travel time) on-site construction administration
services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site
representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having
relevant and appropriate types of construction administration experience. Note: hours stated above are considered part of
the A/E’s Basic Services.
For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form
F110-330), below is a list of relevant scope of work requirements for this RFQ:
1. Identify Project Delivery Method (MP, GC, CMR, DB)
2. Identify Role on Project (AOR, CMA, OA, CMR, DB, GC, Trade)
3. State of Ohio OFCC (Standard Documents / OAKS CI) experience
4. Experience with Building Automation Systems (BAS)
5. Experience with Evidence Storage Facilities
6. Experience with Outdoor Shooting Range Multi-level Platforms
7. Experience with roadway / parking lot design
8. Renovations in occupied secure facilities
C. Estimated Budget / Funding
State Funding:
$11,714,477.00
Other Funding:
$0
Construction Cost: $10,195,024.00
Total Project Cost: $11,714,477.00
D. Anticipated Schedule
Professional Services Start:
Construction Notice to Proceed:
Substantial Completion of all Work:
Professional Services Completed:
01 / 25
01 / 26
02 / 27
04 / 27
E. Estimated Basic Fee Range (see note below)
6.75% to 7.00%
F. EDGE Participation Goal
Percent of initial Total A/E Fee:
5.0%
NOTE: Basic Services include: (1) Program Verification, (2) Schematic Design, (3) Design Development, (4) Construction Documents,
(5) Bidding and Award OR GMP Proposal and Amendment (as applicable), (6) Construction Administration, and (7) Closeout services. The
Basic Fee includes all professional design services and consultant services necessary for proper completion of the Basic Services, including
validation of existing conditions (but not subsurface or hidden conditions) and preparation of cost estimates and design schedules for the
project. The Estimated Basic Fee Range is calculated as a percentage of the Estimated Budget for Construction Cost above, including
the Owner’s contingency. The Basic Fee excludes any Additional Services required for the project.
G. Basic Service Providers Required (see note below)
Lead A/E Discipline: Architecture
Secondary
Disciplines:
Civil Engineering
Structural Engineering
Mechanical-Electrical-Plumbing Eng.
H. Additional Service Providers Required
Surveying
Geotechnical Testing & Analysis
Quality Assurance Testing
Special Inspections (OBC)
Air and Water Testing & Balancing
F110-02-2022-MAR
Publish Date: 9/23/2024
Page 2 of 4
Request for Qualifications (Architect / Engineer) continued
Fire Protection Engineering
Technology/Communications/Security
Interiors/Loose Furnishings Design
NOTE: The lead A/E shall be (1) an architect registered pursuant to ORC Chapter 4703, (2) a landscape architect registered pursuant to ORC
Chapter 4703, or a (3) professional engineer or (4) professional surveyor licensed pursuant to ORC Chapter 4733.
I. Evaluation Criteria for Selection
Demonstrated ability to meet Owner’s programmed project vision, scope, budget, and schedule on previous
projects.
Previous experience compatible with the proposed project (e.g., type, size).
Relevant past work of prospective firm’s proposed consultants.
Past performance of prospective firm and its proposed consultants.
Qualifications and experience of individuals directly involved with the project.
Proposer’s previous experience (numbers of projects, sizes of projects) when working with its proposed
consultants.
Specification writing credentials and experience.
Experience and capabilities of creating or using Critical Path Method (CPM) schedules and of using CPM
schedules as a project management resource.
Approach to and success of using partnering and Alternative Dispute Resolution.
Proximity of prospective firms to the project site.
Proposer’s apparent resources and capacity to meet the needs of this project.
The selected A/E and all its consultants must have the capability to use the Internet within their normal business
location(s) during normal business hours.
Interested A/E firms are required to submit the Commitment to Participate in the EDGE Business Assistance Program
form in its Statement of Qualifications (Form F110-330) submitted in response to the RFQ, to indicate its intent to contract
with and use EDGE-certified Business Enterprise(s), as a part of the A/E’s team. The Intent to Contract and to Perform
and / or waiver request letter and Demonstration of Good Faith Effort form(s) with complete documentation must be
attached to the A/E’s Technical Proposal. Both forms can be accessed via the OFCC website at https://ofcc.ohio.gov. The
Intent to Contract and to Perform form is again required at the Fee Proposal stage.
If the A/E firm intends to receive points for exceeding the EDGE Participation Goal, it must provide BOTH a
completed Commitment to Participate form AND a completed Statement of Intent to Contract and to Perform forms
signed by both parties with its Statement of Qualifications.
For all Statements of Qualifications, please identify the EDGE-certified Business Enterprises, by name, which will
participate in the delivery of the proposed professional services solicited in the RFQ.
Interested A/E firms must indicate on their Statement of Qualifications, the locations where their services will be
performed in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12D
related to providing services only within the United States and the requirements of Executive Order 2022-02D prohibiting
purchases from or investment in any Russian institution or company. Failure to do so may cause their Statement of
Qualifications to be rejected.
J. Submittal Instructions
Firms are required to submit the current version of Statement of Qualifications (Form F110-330) available via the OFCC
website at https://ofcc.ohio.gov.
Electronic submittals should be combined into one PDF file named with the project number listed on the RFQ and your
firm’s name. Use the “print” feature of Adobe Acrobat or similar software for creating a PDF rather than using a scanner. If
possible, please reduce the file size of the PDF. In Acrobat, go to Advanced, then PDF Optimizer. Also, please insert the
project number and firm name followed by “SOQ” in the email subject line.
Statements of Qualifications must be submitted electronically by email. Submittals are limited to one email with a
maximum file size of 25 MB.
Firms are requested to identify professional registrations, memberships and credentials including: LEED GA, LEED AP,
LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and construction industry credentials.
Identify that information on the resume page for individual in Block 22, Section E of the F110-330 form.
F110-02-2022-MAR
Publish Date: 9/23/2024
Page 3 of 4
Architect / Engineer Selection Rating Form
State of Ohio Standard Forms and Documents
Project Name London Projects FY25/26
Project Number AGO-250002
Proposer Firm
City, State, Zip
Selection Criteria
1. Primary Firm Location, Workload and Size (Maximum 10 points)
a. Proximity of firm to project site
b. Amount of fees awarded by Contracting Authority in
previous 24 months
c. Number of licensed professionals
Less than 50 miles
50 miles to 100 miles
More than 100 miles
Less than $500,000
$500,000 to $2,000,000
More than $2,000,000
Less than 3 professionals
3 to 10 professionals
More than 10 professionals
2. Primary Firm Qualifications (Maximum 30 points)
a. Project management lead
b. Project design lead
c. Technical staff
d. Construction administration staff
Experience / ability of project manager to
manage scope / budget / schedule / quality
Experience / creativity of project designer to
achieve owner’s vision and requirements
Experience / ability of technical staff to create
fully coordinated construction documents
Experience / ability of field representative to
identify and solve issues during construction
3. Key Consultant Qualifications (Maximum 20 points)
a. Key discipline leads
b. Proposed EDGE-certified Consultant participation*
Experience / ability of key consultants to
perform effectively and collaboratively
One point for every 2 percent increase in
professional services over the EDGE
participation goal
4. Overall Team Qualifications (Maximum 10 points)
a. Previous team collaboration
b. LEED** Registered / Certified project experience
c. BIM project experience
d. Team organization
Less than 4 sample projects
4 to 6 sample projects
More than 6 sample projects
Registered LEED v4.0 or v4.1 projects
Certified LEED v4.0 or v4.1 projects
Training and knowledge
Direct project experience
Clarity of responsibility / communication
demonstrated by table of organization
5. Overall Team Experience (Maximum 30 points)
a. Previous team performance
b. Experience with similar projects / delivery methods
c. Budget and schedule management
d. Knowledge of Ohio Capital Improvements process
Past performance as indicated by
evaluations and letters of reference
Less than 4 projects
4 to 6 projects
More than 6 projects
Performance in completing projects within
original construction budget and schedule
Less than 3 projects
3 to 6 projects
More than 6 projects
Value
Score
5
2
0
2
1
0
0
3
1
Max
=3
0 - 10
0-5
0-5
0 - 10
Max
= 20
0 - 15
0-5
1
2
3
Max
=3
1
Max
2
=2
1
Max
3
=3
0-2
0 - 10
0-3
4-6
7 - 10
0-5
0-1
2-3
4-5
* Must be comprised of professional design services consulting firms and NOT the lead firm - For more
information on scoring this and other criteria refer to Document F199-01 - PS Selection Rating Rubric.
** Leadership in Energy & Environmental Design administered by Green Business Certification Inc.
Notes:
Evaluator:
Name
Subtotal
Signature
Date
F110-02-2022-MAR
Publish Date: 9/23/2024
Page 4 of 4
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Professional includes any architect holding a certificate issued under section 4703.10 of the ...

Ohio Facility Construction Commission

Bid Due: 6/12/2026

...includes any architect holding a certificate issued under section 4703.10 of the Revised ...

Ohio Facility Construction Commission

Bid Due: 6/12/2026

.... of electronic copies requested (PDF) 1 * "Registered Design Professional includes any ...

Ohio Facility Construction Commission

Bid Due: 6/18/2026

...N/A TBD Request for Qualifications (Criteria Architect/Engineer*) State of Ohio Standard Forms.... of ...

Ohio Facility Construction Commission

Bid Due: 6/05/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.