Kingston Boardwalk Trail - Addendum 4

Location: South Carolina
Posted: Jun 25, 2026
Due: Jun 30, 2026
Agency: City of Conway
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Kingston Boardwalk Trail - Addendum 4

Attachment Preview

RE: Kingston Boardwalk Trail – Phase 1
City of Conway
AECOM Project No. 60733260-05
AECOM Technical Services, Inc.
1831 W Evans Street
Suite 200
Florence, SC 29501
Phone: (803) 254-4400
Sent via Duncan Parnell
June 25, 2026
ADDENDUM NO. 4 – June 25, 2026
TO: ALL HOLDERS OF RECORD OF BID DOCUMENTS
Acknowledge receipt of this addendum by inserting its number and date in the Bid Form.
Failure to do so may subject bidder to disqualification. This addendum forms a part of
the Contract Documents. It modifies them as follows:
Clarifications:
For bid submission, a single, sealed bid is required containing both Division 1 and
Division 2 to form a complete contract. Additionally, all documents listed in Section
00100.23 must be included with the bid to constitute a complete bid submission.
Plans:
Attached is modified plan Sheet C4. Revisions include clarifications to the ADA manual
lift and modifications to the ADA ramp/platform. The floating dock/ fixed dock gangway
ramp shall be 30 feet in length.
END OF ADDENDUM NO. 4
NOTES:
1. CONTRACTOR MAY SELECTIVELY TRIM LIMBS THAT COULD POTENTIALLY
INTERFERE WITH INSTALLATION OF PILES / BOARDWALK / DOCK STRUCTURE.
TRIMMING SHOULD BE KEPT TO A MINIMUM OF +/-3' OUTSIDE OF THE LIMITS OF
THE BOARDWALK / DOCK.
2. IF TREE REMOVAL IS DEEMED NECESSARY FOR CONSTRUCTION OF DOCK /
BOARDWALK, CONTRACTOR SHALL COORDINATE WITH THE CITY AS TO WHICH
TREES MAY OR MAY NOT BE REMOVED.
3. ANY STUMPS RESULTING FROM TREE REMOVAL THAT WILL NOT AFFECT PILE /
DOCK / BOARDWALK INSTALLATION SHALL BE CUT LEVEL WITH EXISTING
GROUND AND MAY REMAIN IN PLACE.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL / DISPOSAL OF ANY
DEBRIS, TRASH, ETC. ASSOCIATED WITH CONSTRUCTION AT NO EXTRA COST
TO THE OWNER.
5. CONTRACTOR TO COORDINATE WITH THE ENGINEER / OWNER ON LOCATION OF
STAGING / LAY-DOWN AREA FOR THE PROJECT PRIOR TO MOBILIZATION.
6. A GEOTECHNICAL REPORT IS BEING PROVIDED FOR INFORMATION TO THE
CONTRACTOR / STRUCTURAL ENGINEER. ADDITIONAL GEOTECHNICAL
INVESTIGATION MAY BE NECESSARY TO DETERMINE REQUIREMENTS FOR
PILING DEPTH, LOCATION, QUANTITY, BEARING CAPACITY, ETC. CONTRACTOR
SHALL BE RESPONSIBLE FOR OBTAINING ANY ADDITIONAL GEOTECHNICAL
INVESTIGATION / REPORTS AS REQUIRED BY THE STRUCTURAL ENGINEER.
7. CONTRACTOR SHALL SUBMIT BOARDWALK STRUCTURAL PLANS TO OWNER /
ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION.
8. CLEARING IS FOR FELLING OF TREES ONLY. TREES TO BE GENERALLY FELLED
IN THE DOWNSTREAM DIRECTION. NO GRUBBING OR REMOVAL OF TREES IS
REQUIRED.
9. CONTRACTOR TO STAKE ALIGNMENT OF BOARDWALK IN THE FIELD FOR
ENGINEER & OWNER REVIEW. ALIGNMENT CAN BE SHIFTED AT DIRECTION OF
THE ENGINEER OR OWNER TO AVOID OBSTRUCTIONS AND LARGE TREES.
10. FLOATING DOCK PILES TO BE INSTALLED WITH A TOP ELEVATION OF 18.0' MSL.
11. ALL WOOD BUILDING MATERIAL TO BE USED SHALL BE 2.5 CCA TREATED
LUMBER.
12. ALL HARDWARE USED (NAILS, BOLTS, SCREWS AND CONNECTORS THAT COME
INTO CONTACT WITH TREATED LUMBER SHALL BE HOT DIPPED GALVANIZED,
STAINLESS STEEL OR OTHER MATERIALS APPROVED BY THE MANUFACTURER
TO MINIMIZE CORROSION CAUSED BY THE ACQ TREATED CHEMICALS.
13. MANUAL ADA LIFT TO BE MOBILIFT VX BY ADAPTIVE ENGINEERING, INC. OR
APPROVED EQUAL. LIFT TO BE CAPABLE OF LIFTING TO 72" HEIGHT. LIFT TO BE
ANCHORED / FASTENED TO DECKING IN A MANNER IT CAN BE UNFASTENED AND
REMOVED AS NEEDED. FLOATING DOCK TO BE FITTED WITH COUNTER
WEIGHTS AS NECESSARY TO COUNTER ADA RAMP AND LIFT WEIGHTS AND
MAINTAIN A LEVEL DOCK. LIFT TO BE FITTED WITH FOLLOWING OPTIONS:
-CX CHASIS
1
-36" LONG X 32" WIDE BR
-4 ANCHOR POINTS
-OPPOSITE SIDE CRANK
-OPPOSITE SIDE BOARDING
-EXTENDED HEIGHT TO 72"
-ANTI SLIP TREATMENT ON RAMPS
14. FLOATING DOCK PILE QUANTITIES AND LOCATIONS TO BE DETERMINED BY THE
STRUCTURAL ENGINEER.
WACCAMAW
RIVER
1
30LF LONG - 4' WIDE
ALUMINUM
GANGWAY RAMP
6'
MANUAL ADA LIFT (ON
ADA PLATFORM)
SECURED WITH 4
ANCHOR POINTS &
WHEELS REMOVED
2.5' TALL
PLATFORM ON
FLOATING DOCK
W/ HANDRAILS
50'
PERMANENT DOCK
(DOCK ELEVATION=8.50')
5' BLACK ALUMINUM
POWDER COATED
GATE (TYP)
10'
30LF LONG - 4'
WIDE ALUMINUM
GANGWAY RAMP
6'
8'
31'
65'
NEAR BANK
HIGH TIDE LINE
FLOATING DOCK
(DOCK ELEV=VARIABLE)
FLOATING DOCK
PILES (TYP)
8'
6'
FROM NEAR MEAN LOW WATER
LINE TO FURTHERMOST POINT
OF DOCK
LIMITS OF
CLEARING
(TYP)
8' WIDE WOODEN
BOARDWALK
PERMANENT DOCK
HANDRAIL TO MATCH AND
TIE INTO BOARDWALK
HANDRAIL (TYP)
PLAN
PROJECT
KINGSTON
BOARDWALK TRAIL -
PHASE I
CLIENT
CITY OF CONWAY
2940 JERRY BARNHILL BOULEVARD
CONWAY, SOUTH CAROLINA 29526
843.397.2494 TEL.
843.488.9890 FAX.
CONSULTANT
AECOM
1831 WEST EVANS STREET - SUITE 200
FLORENCE, SC 29501
803.254.4400 TEL
WWW.AECOM.COM
REGISTRATION
UTH CAROLI
AECOM
TECHNICAL
SERVICES, INC.
No. 1473
ATE OF AUTHO
ISSUE/REVISION
1 2052/159/1/200/216 IRSESVUDE-DCOFOERCOBIMDMSENTS
1 6/25/2026
I/R
DATE
REV'D PER ADDENDUM 4
DESCRIPTION
KEY PLAN
SHEET SCALE: AS SHOWN
BID DOCUMENTS
THESE DOCUMENTS ARE FOR
PURPOSE OF SOLICITATION OF
ARE NOT FOR USE FOR CONSTR
PROJECT & FILE NUMBER
PROJECT NUMBER: 60733260
FILE NUMBER: T5
SHEET TITLE
DIVISION 1:
PROPOSED DOCK
PLAN
SHEET NUMBER
C4
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Project Name: Heyward Street Waterline Replacement (CIP-2257) Agency/Owner: Beaufort - Jasper Water &

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 8/04/2026

Project Name: McCormick One Stop Renovations Agency/Owner: Town of McCormick Ad Publish Date:

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 8/11/2026

Ad Title: Barnwell County Emergency Debris Removal Purchasing Agent/Entity: Barnwell County Ad Publish

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 8/07/2026

Project: CIP-2257 Heyward Street Waterline Replacement Ref. #: 2027-IFB-001 Type: IFB Status: Open

Beaufort - Jasper Water & Sewer Authority

Bid Due: 8/04/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.