| Location: | Wyoming |
|---|---|
| Posted: | May 7, 2026 |
| Due: | Jun 4, 2026 |
| Agency: | City of Cheyenne |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: 2026 City Overlay #1
Addenda: 0
Release Date: 5/7/2026
Due Date: 6/4/2026
This project generally consists of roadway rehabilitation and streetscape improvements, including asphalt milling, patching, paving, excavation, and restoration of roadway, alley, and concrete surfaces. The work also includes utility structure adjustments, drainage inlet modifications, curb, gutter, sidewalk, drive approach, and concrete median reconstruction, along with landscaping restoration, irrigation repairs, and erosion control measures.
Additional work includes traffic control, signage, pavement markings, thermoplastic striping, and installation of ADA-compliant detectable warning plates to complete the roadway and pedestrian improvements.

With GovernmentContracts, you can:
...-Qualification: Yes Project Description Project Category Code: DOT Projects Description: Mill, overlay..., and ...
State of Wyoming - Department of Transportation
Bid Due: 10/08/2026
...Projects Description: Mill, overlay and bridge rehabilitations (12 structures); Involving milling... asphalt pavement, ...
State of Wyoming - Department of Transportation
Bid Due: 10/08/2026
...Description: Mill, overlay, bridge replacement (2 structures), and bridge rehabilitation (3 structures...); Involving ...
State of Wyoming - Department of Transportation
Bid Due: 10/08/2026