| Location: | Connecticut |
|---|---|
| Posted: | Jul 9, 2025 |
| Due: | Aug 12, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 31108 |
| Publication URL: | To access bid details, please log in. |
The Miami Beach Association Sewer and Association Improvements Project includes constructing 19,500 linear feet of gravity sewer mains and lateral services, 350 linear feet of horizontal directional drilling, 6,705 linear feet of storm drainage, restoration of unpaved areas to existing conditions or better, temporary trench repair and the reconstruction of Association roads. The project also consists of four bid alternates. They are helical piles and support system, permanent trench repair, mill and overlay, or cold reclaimed subbase & 4-inch HMA pavement. Electronic Copies of the contract Documents may be obtained at Project DOG ( www.projectdog.com). Log in and enter the Project Code 869816 in the search box and select "Acquire Documents" for a free, downloadable bid set. Addenda, if issued, will be posted to the Projectdog website and shall be accompanied by e-mail notification to every individual or firm on record as having received the Bid Documents.
Margaret Allen, EIT Fuss and O'Neill, Inc. One Financial Plaza 15th Floor Hartford, CT 06103 Margaret.Allen@fando.com 860 783-4792

With GovernmentContracts, you can:
...Green Road Drainage The project will consist of replacing the existing 36" storm ...
State Government of Connecticut
Bid Due: 6/17/2026
...Project ID: Title: B026-62 Green Road Drainage Addenda: 0 Release Date: 5/15/2026 Due ...
City of Meriden
Bid Due: 6/17/2026
...with concrete curbing, concrete sidewalk ramps, storm drainage modifications, sanitary sewer...
Town of Beacon Falls
Bid Due: 7/02/2026