| Location: | Connecticut |
|---|---|
| Posted: | Mar 16, 2026 |
| Due: | Apr 6, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | UCHC4-212880570 |
| Publication URL: | To access bid details, please log in. |
Prequalification: PET-CT System in the Connecticut Tower (Building H)
UConn Health (UCH) will be renovating approximately 1,200 square feet of the main floor hospital located in the Connecticut Tower (Building H) at 263 Farmington Ave. Farmington, CT including the renovation of existing space to accommodate installation of a new PETCT system and supporting spaces. The spaces will receive layout modifications, new finishes, millwork, imaging equipment, hot lab and modified MEPs. Applicants must be prequalified by the Department of Administrative Services (DAS), for the Classification of GENERAL BUILDING CONSTRUCTION (GROUP C) to participate in this Prequalification Application.
Matthew Rood rood@uchc.edu

With GovernmentContracts, you can:
...Florence S. Lord Senior Housing Renovations Renovation of an existing 24-unit apartment building.... ...
State Government of Connecticut
Bid Due: 6/16/2026
..., renovations to the existing building, and an addition at Fire Station 4 ...
City of Norwalk
Bid Due: 6/24/2026
...20,000 SF, full-gut interior renovation of the existing 31,800 SF building, selective need-based ...
State Government of Connecticut
Bid Due: 6/22/2026
...of the site improvements, renovations to the existing building, and an addition at ...
City of Norwalk
Bid Due: 6/24/2026