| Location: | Massachusetts |
|---|---|
| Posted: | Jun 25, 2026 |
| Due: | Jun 25, 2026 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 12FPC326B0012 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Please see Tyler Dam Addendum No. 1 in the attachments/links section for further details and updates.
Tyler Dam Rehabilitation Worchester County, MA
Site Showing on:
Wednesday, May 27ᵗʰ at 10:00 AM at the site
200 Robin Hill Street
Marlborough, MA 01752
The work consists of rehabilitating the existing dam to be in compliance with current safety and performance standards. Engineering studies identified that the dam has inadequate auxiliary spillway capacity that would result in overtopping and breaching of the embankment during the probable maximum flood. The major items of work include: excavating the approach channel upstream
of the auxiliary spillway drop structure by 2.5 feet to improve flow efficiency; installing a geosynthetic clay liner in the auxiliary spillway approach; raising portions of the dam embankment crest to provide additional freeboard and create a uniform crest elevation; constructing a concrete crest wall to provide freeboard and prevent overtopping at a low spot where Robin Hill Street
intersects the top of dam; replacing concrete joint sealant above the waterline in the auxiliary spillway and in the principal spillway conduit; replacing existing chain-link fencing surrounding the auxiliary spillway drop structure; and removing trees within 20 feet of the right upstream embankment groin.
| May 19, 2026 | [Combined Synopsis/Solicitation (Original)] NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam |
| May 20, 2026 | [Combined Synopsis/Solicitation (Updated)] NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam |
| Jun 11, 2026 | [Combined Synopsis/Solicitation (Updated)] NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam |

With GovernmentContracts, you can:
...equipment. This RFR will include all equipment and products related to the detection ...
Commonwealth of Massachusetts
Bid Due: 4/01/2027
...Follow Track System Safety Research Active Contract Opportunity Notice ID 6913G626Q300043 Related... Classification ...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 8/03/2026
...19.14) Product Service Code: J042 - MAINT/REPAIR/REBUILD OF EQUIP- FIRE FIGHTING/RESCUE/SAFETY EQUIP...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 8/10/2026
...Original Inactive Date: Sep 02, 2026 Initiative: None Classification Original Set Aside: Product ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 8/03/2026