| Location: | Ohio |
|---|---|
| Posted: | Jun 1, 2026 |
| Due: | Jun 16, 2026 |
| Agency: | State Government of Ohio |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SRC0000039767 |
| Publication URL: | To access bid details, please log in. |
| Solicitation ID: | SRC0000039767 |
| Solicitation Name: | ODOC- Non-IT Goods & Services - Live Fire Training Structure Repairs - 05/19/26 |
| Original Begin Date: | 6/1/2026 8:46:27 AM |
| Begin Date: | 6/1/2026 8:46:27 AM |
| End Date: | 6/16/2026 8:00:00 AM |
| Inquiry End Date: | 6/15/2026 12:00:00 AM |
| Commodity: | Building maintenance service |
| MBE Set Aside: | MBE Set Aside |
| Agency: | COM650000 State Fire Marshal COMSFM |
| Solicitation Status: | Open for Bidding |
| Solicitation Type: | Quick Quote |
|
In an MBE set-aside solicitation, only those bidders/suppliers with an active MBE certification at the time the solicitation closes can submit a response
|
|||
|
Solicitation ID
SRC0000039767
|
|||
|
Solicitation Name
ODOC- Non-IT Goods & Services - Live Fire Training Structure Repairs - 05/19/26
|
RFx Type
Quick Quote
|
||
|
Lot #
1
|
Solicitation Status
Open for Bidding
|
||
|
Round #
1
|
MBE Set Aside
|
||
|
Begin Date
6/1/2026 8:46:27 AM (ET)
|
Amendment?
|
||
|
End Date
6/16/2026 8:00:00 AM (ET)
|
Inquiry End Date
6/15/2026 12:00:00 AM
|
||
|
Summary
OHIO FIRE ACADEMY (OFA) LIVE FIRE TRAINING STRUCTURE Labor and material to complete required NFPA inspections (Including but not limited to NFPA 1402 & 1403) and maintenance of the OFA live burn facility with System 203 thermal lining system, and fire paver floors for the following broken down below. *Including a general inspection of building / system, that involves removal (and replacement) of tiles for engineering inspection. (Per NFPA) Once required NFPA inspection completed, overall general inspection for; replacement of missing or loose bolt holes, tightening anchors as required, replacement of missing or badly damaged joint packing mix, replacement of 400-500 missing or badly cracked fire pavers and replacement of approx. 25 – 50 thermal lining tiles. If additional work is required, advise of that requirement and submit a proposal to complete same. Original quantity Estimated quantity Tile Maintenance 5000 1500-1600 Replacement Tiles 25-50 Packed Joints 200 Inft 100 -150 Inft Temporary Heat 3-4 days Fire Brick 18000 500 *All in compliance with NFPA Standards, and Ohio Department of Public Safety Division of EMS (excerpt only, below) NFPA 1403, Chapter 7.2 Non-Gas-Fired Live Fire Training Structures and Mobile Enclosed Live Fire Training Props (2018) 7.2.7 The structural integrity of the live fire training structure shall be evaluated and documented by a licensed professional engineer with live fire training structure experience and expertise or by another competent professional as determined by the AHJ at least once every 5 years or more frequently if determined to be required by the evaluator.
|
Predecessor Contract
|
||
|
Process
Itemized Quote. The quote shall be itemized and include the following: estimated shipping, company name, contact information, including name, phone number and email to which COM should remit the purchase order.Nothing herein guarantees that the quote will be accepted by Commerce.
|
|||
|
Ship To
|
|||
1 Record(s)
|
0 Record(s)
|
0 Record(s)
|

With GovernmentContracts, you can:
Procurement Description Important Dates Procurement Release Date: Pre-Quotation Conference: Procurement Due: Aug 22,
Greater Dayton Regional Transit Authority
Bid Due: 9/06/2032
Project ID: Title: Bus Replacement Parts Addenda: 0 Release Date: 6/23/2026 Due Date:
Southwest Ohio Regional Transit Authority
Bid Due: 7/23/2026
Project ID: RFQ-85002 Title: Renewable Energy Facility Waste Heat Boiler Repair Services Addenda:
Northeast Ohio Regional Sewer District
Bid Due: 7/22/2026
Follow ARGUS SUBSCRIPTON Active Contract Opportunity Notice ID SP470626Q0021 Related Notice Department/Ind. Agency
DEPT OF DEFENSE
Bid Due: 7/24/2026