| Location: | Idaho |
|---|---|
| Posted: | Sep 24, 2025 |
| Due: | Oct 8, 2025 |
| Agency: | Ada County Highway District |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CT226-08 |
| Publication URL: | To access bid details, please log in. |
Project ID: CT226-08
Title: Munger Road Bridges #1005 and #2001
Addenda: 0
Release Date: 9/23/2025
Due Date: 10/8/2025
In accordance with the plans and specifications, this work shall consist of r Replacing two culvert bridges with a box culverts, headwalls, wing walls, and riprap. Also includes curb, gutter, and sidewalk, pedestrian ramps, roadway reconstruction, valley gutters, irrigation pipe, expanding a stormwater drainage basin, and sewer and water line work .
Join Zoom Meeting: October 8, 2025, at 3:00 PM
Meeting ID: 811 9408 3669
Passcode: 615839

With GovernmentContracts, you can:
...Control drum actuators The Heat Management System (HMS) heat pipes Power Conversion System ...
ENERGY, DEPARTMENT OF
Bid Due: 9/24/2026
...Geothermal HDPE Materials (GEO1006) Geothermal HDPE Pipe and fittings to replace main lines ...
City of Boise
Bid Due: 9/30/2026
...-inch diameter, 777 L.F. of 10-inch diameter, and 2,450 L.F. of 8-inch diameter ...
City of Boise
Bid Due: 9/25/2026