OLD HICKORY - SEWER SYSTEM REPLACEMENT AND BACKFLOW PREVENTER ASSEMBLY REPLACEMENT
| Location: |
Federal |
| Posted: |
Feb 11, 2025 |
| Due: |
Feb 24, 2025 |
| Agency: |
DEPT OF DEFENSE |
| Type of Government: |
Federal |
| Category: |
- Y - Construction of Structures and Facilities
|
| Solicitation No: |
W912P525BA001 |
| Publication URL: |
To access bid details, please log in. |
OLD HICKORY - SEWER SYSTEM REPLACEMENT AND BACKFLOW PREVENTER ASSEMBLY REPLACEMENT
Active
Contract Opportunity
Related Notice
W912P525BA001
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
USACE
Sub Command
LRD
Office
W072 ENDIST NASHVILLE
Looking for contract opportunity help?
General Information View Changes
-
Contract Opportunity Type: Solicitation (Updated)
-
Updated Published Date: Feb 11, 2025 01:00 pm CST
-
Original Published Date: Jan 22, 2025 07:45 pm CST
-
Updated Date Offers Due: Feb 24, 2025 12:00 pm CST
-
Original Date Offers Due: Feb 24, 2025 12:00 pm CST
-
Inactive Policy: Manual
-
Updated Inactive Date: Feb 11, 2026
-
Original Inactive Date:
Jan 23, 2026
-
Initiative:
Classification
-
Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
-
-
Product Service Code: Y1ND - CONSTRUCTION OF SEWAGE AND WASTE FACILITIES
-
NAICS Code:
-
237110 - Water and Sewer Line and Related Structures Construction
-
Place of Performance:
Description View Changes
Amendment 0001: The purpose of Amendment 0001 to Solicitation W912P525BA001 is to incorporate the following changes:1) Bidder Inquiry closing date is 14 February 2025.2) Provide Sign-In Sheet from Pre-Proposal Site Visit. 3) Include Attachment: W912P5-25-B-A001 TPlans - Package A Q15-OHSSR-C-103 - 2025-01-30The USACE, Nashville District (LRN) is acquiring a Design Bid Build (DBB) Construction Contract for the removal of an existing sewer treatment system and construction of a new sewer treatment system on the Lock side and the existing powerhouse side of Old Hickory Project Site. The work includes replacement of existing sanitary sewer lines, construction of new Polyethylene force main, construction of one (1) lift station in the left bank area of Old Hickory, construction of one (1) new lift station in the Old Hickory Powerhouse, construction of one (1) new jib crane in the power house for pump removal, and construction of one (1) flow meter in the new discharge line of the new lift station in the powerhouse. Please review the technical plans and specifications that will be provided upon request due to security categorization.
Attachments/Links
Contact Information View Changes
Contracting Office Address
-
KO CONTRACTING DIVISION 801 BROADWAY RM A604
-
NASHVILLE , TN 37203-1070
-
USA
Secondary Point of Contact
History
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...Follow REPLACE LIFT STATION PUMPS AT HOZHO PT. Active Contract Opportunity Notice ID ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 7/06/2026
...Follow J--LAKE25-101-CC LIFT STATION PUMP REPAIR Active Contract Opportunity Notice ID... attached QA. ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/06/2029
...improvements: REPLACEMENT OF EXISTING WASTEWATER LIFT STATION NO. 1 AND NEW FORCE MAINS ...
MPN
Bid Due: 6/13/2077
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.