Camping World Stadium Converged Network System (CNS) Design and Installation Project

Location: Florida
Posted: Sep 9, 2026
Due: Oct 20, 2026
Agency: City of Orlando
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.


Project ID:

Title: Camping World Stadium Converged Network System (CNS) Design and Installation Project

Addenda: 0

Release Date: 9/9/2026

Due Date: 10/20/2026

Follow
Camping World Stadium Converged Network System (CNS) Design and Installation Project
Request For Proposal
Orlando Venues
20464 , 20614 , 20664 , 20827 , 20928 ... show all
Project ID: RFP26-0578
Release Date: Wednesday, September 9, 2026
· Due Date: Tuesday, October 20, 2026 2:00pm
Posted Wednesday, September 9, 2026 1:55pm
All dates & times in Eastern Time - New York
Draft Response Events RSVP No Bid40 days, 16 hours, 34 minutes


Post Information

Posted At:Wed, Sep 9, 2026 1:55 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

City of Orlando is seeking proposals from qualified vendors for the installation of a comprehensive network and wi-fi system at Camping World Stadium (“Stadium”) which is currently under renovation in Orlando FL. The objective is to replace the core network, including all edge switching, and the wi-fi system in the stadium. The goal is an elevated, more reliable fan experience that is expected in a world class facility



Background

The project involves the design and installation of a robust network and wi-fi infrastructure for an approximately 66,000-seat outdoor football stadium, including switches, wi-fi access points, and related equipment, to ensure seamless connectivity for fans, staff, and vendors within the Stadium. This network will be a net new endeavor. This system is intended to be a turnkey system. There will be no requirements for ongoing support for this system after the installation and initial operating period. We will be utilizing the building’s existing fiber backbone, but none of the Cat5/6 cable will be reused. This project cutover needs to be incredibly well coordinated with City of Orlando as there will be events occurring during the renovation that will use the old network. As part of the design, we would like a proposed cutover plan to be submitted that achieves our proposed schedule while working around active construction and events.

The system will be 100% operational by July of 2027. Camping World Stadium will be hosting the Jacksonville Jaguars for the entire 2027 season so this date cannot be missed under any circumstances.

The Selected Vendor will contract through City of Orlando for business terms of the agreement including, but not limited to, technical design review with owner and project team, installation of the system, coordination with internal and external stakeholders, and initial support of the system through a contracted number of events. The Selected Vendor will coordinate with owner’s representatives (Legends Global), low voltage design and engineering contractors (Henderson), construction manager (Barton Mallow / AECOM), and others as necessary to ensure successful completion of the scope of work within the project schedule and project budget.

The Selected Vendor will provide a project manager as a single point of contact to work with ownership and the project team throughout the entire project. The PM will attend meetings both on-site and virtual as necessary and will be on-site as necessary throughout the construction process.



Timeline

Release Project Date:
September 9, 2026
Pre-Proposal Meeting (Mandatory):
September 23, 2026, 10:00am
The Mandatory Pre-Proposal Meeting will be held in the FCS Varsity Club, located at:

One Citrus Bowl Place
Orlando, FL 32805

Enter through McCracken Field entrance (corner of Tampa Ave & Long St.) and park in Lot 6. Transportation & Parking Map provided as Exhibit 4.

ALL MANDATORY REQUIREMENTS STATED IN SECTION 6.5 Mandatory Pre-Proposal Conference Requirements MUST BE RECIEVED BY THE REQUIRED DATE PROVIDED OR YOU WILL NOT ENTER THE STADIUM FOR THE WALKTHROUGH
Question Submission Deadline:
September 28, 2026, 5:00pm
Proposal Submission Deadline:
October 20, 2026, 2:00pm
JOIN THE VIRTUAL PROPOSAL OPENING.
Online: https://teams.microsoft.com/meet/250755804227148?p=1rhqbJiyrZ9WxeJNpe
Meeting ID: 250 755 804 227 148
Passcode: 78Jz6cQ2

Or, call into the virtual meeting by dialing this phone number: +1 321-247-7568
Once dialed-in and prompted, enter the Conference ID: 250 755 804 227 148
Passcode: 78Jz6cQ2
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Event: Medical Director Services Event: 185-0 Reference: RFP 2026-026 Category: Sub Category: Type:

City of Coral Gables

Bid Due: 9/30/2026

Title Start Date End Date Status RFP No. 26-34-26101 POLICE PROMOTIONAL ASSESSEMENT TESTING

Jacksonville International Airport

Bid Due: 9/29/2026

Project ID: RFB 27-001 Title: Tire Supply and Roadside Services Addenda: 0 Release

City of Clermont

Bid Due: 10/15/2026

Project: Passenger Loading Bridge Replacement Ref. #: RFSQ-112-26-RR Department: AVIATION Type: RFSQ Status:

City of Tallahassee

Bid Due: 10/01/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.