| Location: | South Carolina |
|---|---|
| Posted: | Feb 11, 2025 |
| Due: | Mar 10, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | NC-19-22 |
| Publication URL: | To access bid details, please log in. |
The work involves furnishing and installing 328 LF of 48-inch reinforced concrete pipe, 80 LF of 36-inch reinforced concrete pipe, 80 LF of 24-inch reinforced concrete pipe, excavation of an existing drainage channel; installation of sanitary sewer conflict boxes; utility coordination; as well as installation of related structures, pavements and appurtenances as shown on the drawings and as specified.

With GovernmentContracts, you can:
...Project Name: Design & Build Services Hangers W & Y at Downtown Airport ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/11/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Mosely... Designs Email: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Moseley Designs Email...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...19, 2026 - 2:00pm Project Location: Pendleton, SC Project Delivery Method: Design-Bid-Build... qualified ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/19/2026