| Location: | Missouri |
|---|---|
| Posted: | Mar 18, 2026 |
| Due: | Apr 9, 2026 |
| Agency: | City of Jefferson |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB4364-03/26 |
| Publication URL: | To access bid details, please log in. |
Project Description: The City of Jefferson is requesting sealed bids for the Bolivar Street Sidepath, TAP-3101 (508). The proposed work includes: the furnishing of all material, labor, and equipment to construct a 10-footwide concrete trail along the eastern side of Bolivar Street from just north of Missouri Boulevard to W. Main Street including the construction of the concrete trail, curb and gutter, concrete pavement, commercial drive approaches and driveways, a modular block retaining wall, monolithic toe walls, pedestrian guard railing, pedestrian warning lights and signs, pavement marking, grading, and other ancillary construction.

With GovernmentContracts, you can:
..., Jasmine Road Box Culvert, Construction of a 20-foot span by 5-foot rise ...
Missouri Department of Transportation(MDOT)
Bid Due: 6/18/2026
...Walkway, curb & sidewalk construction, site restoration, concrete work, pavement repair, ADA...
St. Louis region
Bid Due: 6/09/2026
...- Pedestrian Walkway, curb & sidewalk construction, site restoration, concrete work, pavement repair, ...
St. Louis region
Bid Due: 6/09/2026
...and designated as bid for TAP-2000(209) 2ND Street Sidewalk Extension. The proposed work ...
Missouri Department of Transportation(MDOT)
Bid Due: 6/18/2026