| Location: | Utah |
|---|---|
| Posted: | Nov 13, 2025 |
| Due: | Nov 20, 2025 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 10/25 Public Works |
| Publication URL: | To access bid details, please log in. |
Project Description: This is the third phase of the project to reconstruct the roadway and replace all of the utilities in the Main Street Right-of-Way from 500 South to 700 South. This includes replacing the culinary waterline and laterals, pressurized irrigation waterline and laterals, sewer main and laterals, adding a new storm drain system and power. The roadway will be reconstructed from the back of sidewalk to the back of sidewalk for the two block length.

With GovernmentContracts, you can:
...Project: Provo City Storm Drain Materials Ref. #: PR2026001029 Department: CITIES - Provo ...
State Government of Utah
Bid Due: 6/16/2026
...Project: 2026 2000 S Storm Drain Project Ref. #: 25-044 Department: CITIES - ...
State Government of Utah
Bid Due: 6/11/2026
...Project: Request for Information - Roads, Trails, Storm Drain Systems, and Winter Maintenance... ...
State Government of Utah
Bid Due: 6/22/2026
...of storm drain utilities, reconstructing ADA ramps, and striping. The site of the ...
State Government of Utah
Bid Due: 6/25/2026