| Location: | Utah |
|---|---|
| Posted: | Nov 13, 2025 |
| Due: | Nov 20, 2025 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 10/25 Public Works |
| Publication URL: | To access bid details, please log in. |
Project Description: This is the third phase of the project to reconstruct the roadway and replace all of the utilities in the Main Street Right-of-Way from 500 South to 700 South. This includes replacing the culinary waterline and laterals, pressurized irrigation waterline and laterals, sewer main and laterals, adding a new storm drain system and power. The roadway will be reconstructed from the back of sidewalk to the back of sidewalk for the two block length.

With GovernmentContracts, you can:
...Project: NS27-8 Farm Creek Irrigation Company - Farm Creek Canal Rehabilitation Ref. #: ...
State Government of Utah
Bid Due: 8/07/2026
...but is not limited to: Site improvements, utility infrastructure, hardscape, irrigation and landscaping...
State Government of Utah
Bid Due: 8/10/2026
...of the existing trail, relocating or installing new irrigation heads, replacing existing timber ...
State Government of Utah
Bid Due: 8/05/2026
...Structures & Furnishings, Masonry, Landscaping, and Irrigation....
State Government of Utah
Bid Due: 8/07/2026