Forestry Cutter/Mulcher with Forestry Applications Kit and Door wiring
| Location: |
Federal |
| Posted: |
Aug 5, 2025 |
| Due: |
Aug 22, 2025 |
| Agency: |
DEPT OF DEFENSE |
| Type of Government: |
Federal |
| Category: |
- 38 - Construction, Mining, Excavating, and Highway Mainenance Equipment
|
| Solicitation No: |
W912ES25QA052 |
| Publication URL: |
To access bid details, please log in. |
Forestry Cutter/Mulcher with Forestry Applications Kit and Door wiring
Active
Contract Opportunity
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
US ARMY CORPS OF ENGINEERS
Sub Command
ENGINEER DIVISION MISSISSIPPI VALLEY
Office
W07V ENDIST ST PAUL
Looking for contract opportunity help?
General Information
-
Contract Opportunity Type: Solicitation (Original)
-
Original Published Date: Aug 05, 2025 11:13 am CDT
-
Original Date Offers Due: Aug 22, 2025 05:00 pm CDT
-
Inactive Policy: Manual
-
Original Inactive Date:
Sep 22, 2025
-
Initiative:
Classification
-
Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
-
Product Service Code: 3830 - TRUCK AND TRACTOR ATTACHMENTS
-
NAICS Code:
-
333120 - Construction Machinery Manufacturing
-
Place of Performance:
Description
Forestry Cutter/Mulcher with Forestry Applications Kit and Door wiring Harness Fit a 2023 Bobcat T770, M-Series, Serial number AT6343451Drum style High Flow motor (Current Bobcat T770 flow rate of 36.6 gpm) 60-72 inch cutting width Double carbide tipped teeth Rotor Brake to stop from full speed Adjustable push bar/tree bumper Capability to remove up to 12 inch diameter trees Will be used in areas with both soft and hard wood species. Must Include: one extra complete set of carbide tipped teeth Forestry Applications Kit - to include installation Kit shall include the following: (skid steer currently contains fire extinguisher)?Forestry Door (3/4 in. laminated polycarbonate): ?Front and Rear Light Guards: ?Hydraulic Quick Coupler Guard: ?Level II FOPS: (meets ISO 3449) ?Lift Cylinder Debris Shields Muffler Guard: ?Polycarbonate Top, Rear, and Side Windows: {minimum 1/4 in. polycarbonate) Door Wiring Harness Kit-to include installation USACE will be keeping all the components that are being replaced. Installation of Forestry applications kit and Door wiring harness kit: Contractor shall include the installation of any required wiring harness; the required ISO 3449 Level II Falling Object Protective Structure {FOPS), and debris guards for the muffler, lights and hydraulic components. The installation shall be accomplished by the contractor both picking up the skid steer and returning the skid steer to the customer after installation completion of the kits, or by sending a technician to the customer to accomplish the installation. Delivery and installation no later than November 15, 2025.Deliver FOB to:Army Corps of Engineers Lac qui Parle Project9055 1st W Watson, MN 56295.
Attachments/Links
Contact Information
Contracting Office Address
-
KO CONTRACTING DIVISION 332 MINNESOTA STREET SUITE 1500
-
SAINT PAUL , MN 55101-1323
-
USA
Secondary Point of Contact
History
-
Aug 05, 2025 11:13 am CDTSolicitation (Original)
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...Follow S--WOLF TRAP NATIONAL PARK - HAZARDOUS TREE PRUNING Active Contract Opportunity Notice ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/11/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.