| Location: | Nevada |
|---|---|
| Posted: | Sep 24, 2025 |
| Due: | |
| Agency: | TRANSPORTATION, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 6982AF25B000025 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
THIS IS NOT AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE NOT AVAILABLE
COMPETITION: TOTAL SMALL BUSINESS SET-ASIDE
PROJECT NUMBER: NV FTBL 1094(1)
PROJECT NAME: WILSON CAMPGROUND ROAD
PROJECT DESCRIPTION:
The Wilson Campground Road Project is located along Wilson Campground Road, 83 miles northwest of Elko, Nevada. The road is located completely within theBureau of Land Management (BLM) Wilson Reservoir Recreation Management Area and is primarily used to access the Wilson Campground Recreation Area on thenorth end of the project. The need for the project is to improve safety, increase visitor usage, and enhance the driving experience.
SCOPE OF THE WORK:
Wilson Campground Road project is comprised of a 7.23-mile aggregate surfaced road along Wilson Campground Road. The proposed improvements as part of this project include resurfacing the existing roads, site distance improvements including an alignment shift along an existing S-curve area, cattle guard adjustments, drainage improvements, minor bridge repairs, and signing replacements.
Based on available funding and construction cost analyzed during the scoping phase, the project has been broken into a schedule (Schedule A) and an option(Option X). Schedule A consists of resurfacing the 6.21 miles of aggregate road leading towards the campground facilities, multiple hydraulic improvements, and the S curve area improvements. Option X consists of resurfacing the 1.01 miles of aggregate road leading towards the campground facilities, minor bridge repairs, and multiple hydraulic improvements.
PRINCIPAL WORK ITEMS:
20101-0000 Clearing and Grubbing: 14.4 ACRE
20402-0000 Subexcavation: 600 CUYD
30110-0000 Aggregate Surface Course: 22,200 TON
30301-4000 Roadbed Reconditioning: 6.940 MILE
57501-0000 Minor Bridge Work: LPSM
60202-0400 24-INCH Equivalent Diameter Arch or Elliptical Pipe Culvert: 520 LNFT
62407-0000 Placing Conserved Topsoil: 4,500 CUYD
63501-0000 Temporary Traffic Control: LPSM
ANTICIPATED SCHEDULE:
Advertisement – October 2025
Award – December 2025
NTP – December 2025
Contract Completion – November 2026
DISCLOURE OF MAGNITUDE: Between $5,000,000 and $10,000,000.
| Oct 20, 2025 | [Solicitation (Original)] NV FTBL 1094(1) Wilson Campground Road |
| Oct 29, 2025 | [Solicitation (Updated)] NV FTBL 1094(1) Wilson Campground Road |
| Nov 12, 2025 | [Solicitation (Updated)] NV FTBL 1094(1) Wilson Campground Road |
| Nov 19, 2025 | [Solicitation (Updated)] NV FTBL 1094(1) Wilson Campground Road |
| Nov 21, 2025 | [Solicitation (Updated)] NV FTBL 1094(1) Wilson Campground Road |
| Nov 25, 2025 | [Solicitation (Updated)] NV FTBL 1094(1) Wilson Campground Road |