| Location: | Vermont |
|---|---|
| Posted: | May 20, 2025 |
| Due: | Jun 20, 2025 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Washington Keywords: Construction (Non Building), General Contractor, Stream Restoration Bid Description: The Jockey Hollow Dam on the Stevens Branch will be removed. Project construction is anticipated between August 1, 2025 and October 1, 2025. Work tasks will generally involve removal of the concrete dam (~200 CY) and associated remains; removal of trees; sediment removal and haul from river and floodplain (~1,600 CY); invasive species handling; stream channel restoration using onsite bed materials; floodplain restoration with wood; and site restoration. email Jessica Louisos for bid attachments including plans.
|
||||||||||||||||||||

With GovernmentContracts, you can:
...into a gravel wetland, including installation of subsurface material, underdrains, and outlet control...
State Government of Vermont
Bid Due: 8/28/2026
...permanent gravel roadway, and permanent slope stabilization measures both up and down slope ...
State Government of Vermont
Bid Due: 8/07/2026
..., parking lot paving, stormwater conveyance and gravel wetland construction, and parking lot ...
State Government of Vermont
Bid Due: 8/11/2026