| Location: | Pennsylvania |
|---|---|
| Posted: | Apr 1, 2025 |
| Due: | May 7, 2025 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Doylestown Township, Bucks County |
| Publication URL: | To access bid details, please log in. |
Project Description: The work to be performed under this Contract consists of furnishing all materials, equipment, labor and supervision required for Easton Road (SR 0611) and Edison Road/Edison-Furlong Road (SR 2079) Traffic Signal Improvements as shown on the Contract Drawings and specified herein. Modifications include but are not limited to; installation of traffic signal supports and mast arms, controller modification, emergency pre-emption, video detection, signal heads, pedestrian signals and push buttons, signs, wiring, conduit, ADA ramp; maintenance and protection of traffic; and all necessary appurtenant work and materials required to complete the work indicated. The successful Contractor must comply with the Pennsylvania Department of Labor and Industry Prevailing Minimum Wage Determination as indicated in the Contract Documents and must be PENNDOT pre-qualified. All contractors must be pre-qualified with PennDOT in accordance with section 102.01 of PennDOT Publication 408, latest edition.

With GovernmentContracts, you can:
..., and post-installation testing. CCTV videos and reports of the storm sewer from ...
PennBid
Bid Due: 6/12/2026
.... Additional work associated with the installation of the sewer includes but is ...
PennBid
Bid Due: 6/29/2026
...-01 and Contract No. 26-02 and includes the following: pre-construction audio/video work... of ...
PennBid
Bid Due: 7/01/2026