| Solicitation Number: | 274-ES-FO-FY26-OptimistWallWaterproofing |
| Project Title: | Wall Waterproofing Project |
| Description: | The Project consists generally of the following major items: 1. Excavation of exiting grounds for installation of new through wall flashings and weep system. 2. Reinstall the brick veneer, replacing any broken units to match, with surface mounted counter-flashing and new weeps every 36” on center. 3. At the exterior ductwork penetrations, remove the existing brick veneer directly above the penetrations and install properly detailed through-wall flashings with end dams. Reinstall the brick veneer with weeps 24” on center. 4. Replace existing failed wall control joints with new silicone sealant. 5. Repoint all mortar joints on the east elevation to restore integrity and water resistance. 6. Install new clear, breathable, penetrating sealer to entire east elevation. |
| Opening Date: | 8/7/2025 4:00 PM |
| Posted Date: | 7/8/2025 |
| Status: | Open |
| Department: | CITY OF RALEIGH |
|
Solicitation Number
*
274-ES-FO-FY26-OptimistWallWaterproofing
|
Department
CITY OF RALEIGH
|
Status Reason
Open
|
|
|
Opening Date
2025-08-07T16:00:00.0000000
|
Posted Date
*
2025-07-08T14:45:35.0000000Z
|
Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
2025-07-22T04:00:00.0000000Z
|
Special Instructions
Contact: Kingsley Devor’e, Kingsley.Devore@raleighnc.gov
|
||
|
Description
The Project consists generally of the following major items: 1. Excavation of exiting grounds for installation of new through wall flashings and weep system. 2. Reinstall the brick veneer, replacing any broken units to match, with surface mounted counter-flashing and new weeps every 36” on center. 3. At the exterior ductwork penetrations, remove the existing brick veneer directly above the penetrations and install properly detailed through-wall flashings with end dams. Reinstall the brick veneer with weeps 24” on center. 4. Replace existing failed wall control joints with new silicone sealant. 5. Repoint all mortar joints on the east elevation to restore integrity and water resistance. 6. Install new clear, breathable, penetrating sealer to entire east elevation.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can:
...Waterproofing & Joint Sealants; (BP08A) Doors, Frames, Hardware Material + Installation; (BP08B...
State Government of North Carolina
Bid Due: 6/19/2026
...Joint, Waterproofing WC-14: Roofing WC-17: Scaffolding/Shoring WC-15: Glass, Glazing, Exterior Metal...
North Carolina State University
Bid Due: 7/09/2026
...- Millwork - BP066116 - Countertops - BP0700 - Caulking & Waterproofing - ...
North Carolina State University
Bid Due: 6/12/2026
...; Waterproofing WC14: Roofing WC18: Glass, Glazing, Storefront WC20: Millwork/Casework WC20B: Doors...
North Carolina State University
Bid Due: 6/18/2026