UPS VRLA Battery Full String Replacements and Service for NOBH

Location: Ohio
Posted: Nov 13, 2025
Due: Nov 28, 2025
Agency: State Government of Ohio
Type of Government: State & Local
Category:
  • 61 - Electric Wire, and Power and Distribution Equipment
  • J - Maintenance, Repair, and Rebuilding of Equipment
Solicitation No: SRC0000035195
Publication URL: To access bid details, please log in.
Solicitation ID: SRC0000035195
Solicitation Name: UPS VRLA Battery Full String Replacements and Service for NOBH
Original Begin Date: 11/13/2025 12:00:00 AM
Begin Date: 11/13/2025 12:00:00 AM
End Date: 11/28/2025 2:00:00 PM
Inquiry End Date: 11/25/2025 2:00:00 PM
Commodity: Uninterruptible power supply UPS
MBE Set Aside: MBE Set Aside
Agency: DMH911010 TOL CHIEF EXECUTIVE OFFICER NOPH
Solicitation Status: Open for Bidding
Solicitation Type: Quick Quote

Solicitation General Information
In an MBE set-aside solicitation, only those bidders/suppliers with an active MBE certification at the time the solicitation closes can submit a response
Solicitation ID
SRC0000035195
Solicitation Name
UPS VRLA Battery Full String Replacements and Service for NOBH
RFx Type
Quick Quote
Lot #
1
Solicitation Status
Open for Bidding
Round #
1
MBE Set Aside
Begin Date
11/13/2025 12:00:00 AM (ET)
Amendment?
End Date
11/28/2025 2:00:00 PM (ET)
Inquiry End Date
11/25/2025 2:00:00 PM
Summary

The State of Ohio - Department of Behaviorial Health is looking to purchase the following:
These battery tag’s support your 15kva NX UPS unit.  Date code reads: 2/2019

Line Item Line-Item Pricing
Tag#1451359 QTY 24 - HX150E
Tag#1451361 QTY 24 – HX150E
Normal Hr Install (M-F, 8am to 5pm)
Freight
New Battery Verification Service - QTY 2
Total

SCOPE OF WORK
STATIONARY BATTERY SYSTEMS
VRLA (Sealed) Battery
FULL STRING REPLACEMENT
SERVICE PERFORMED
  1. Ensure the battery system is disconnected from UPS and battery system is safe to be worked with.
  2. Verify the integrity of the battery rack/cabinet.
  3. Remove all modules.
  4. Measure and record all open circuit voltages for all units to ensure they can be placed in the string(s) and online.
  5. Replace with new units in the exact same orientation as the old units.
  6. Replace hardware if supplied with the new batteries. If not supplied, inspect, clean and neutralize the existing cables and clean the racks/trays from any possible leaking batteries.
  7. Clean any corrosion from cables if re-using existing cables and clean the racks/trays from any possible leaking batteries.
  8. Add a thin coat of anti-corrosion inhibitor to the face of the connector and to the contact surface of the battery terminal or as directed by the battery manufacturer.
  9. Install tab washers for battery monitoring senses leads.
  10. Torque all connections to the specific “inch pound” requirement specified by the manufacturer of the battery.
  11. Ensure all battery monitoring wires are connected properly, if battery monitoring is present.
  12. Verify that no ground faults exist prior to energizing the battery.
  13. Return the battery system to normal float per the manufacturer’s guidelines.
  14. Measure and record the total battery float voltage (at the battery).
  15. Measure and record charging current.
  16. Measure and record the overall AC ripple voltage.
  17. Measure and record the overall AC ripple current.
  18. Measure and record the ambient temperature.
  19. Measure and record 100% of the jar temperatures.
  20. Measure and record the float voltage of all jars.
  21. Commission the Alber monitor (if present) following the standard commissioning procedures.
  22. Provide the battery the proper Freshening charge per the manufacturer’s guidelines.
  23. Clean the site of any foreign materials left behind.
  24. Prepare batteries for recycling and transportation (wrap the batteries with plastic wrap to secure them to the pallets)

SCOPE OF WORK
SEALED VRLA BATTERIES (10 YEAR DESIGN LIFE)
BATTERY VERIFICATION SERVICE

Battery Verification Service
First trip:
  1. Inspect the appearance and cleanliness of the battery and the battery room area. Record any findings
  2. Visually inspect the jars and covers for cracks and leakage. Record any findings
  3. Visually inspect the racks or cabinets for any deficiencies. Record any findings.
  4. Confirm that ventilation is provided.
  5. Visually inspect for evidence of corrosion at terminals and connectors ensuring that the connections meet manufacturer’s requirements.
  6. Tighten all battery connections to the battery manufacturer's specifications and record the value utilized.
  7. Ensure connections are properly prepped per the manufacturers IOM.
  8. Measure and record the total string voltage.
  9. Measure and record the float voltage of all cells.
  10. Measure and record the ambient temperature.
  11. Measure and record the jar temperature.
  12. Place battery online.
  13. Verify and record the battery float voltage.
  14. Measure and record the AC ripple voltage.
  15. Measure and record the AC ripple current.
  16. Follow Note 2, below.
Second Trip:
  1. Measure and record the ambient temperature.
  2. Measure and record cell temperatures.
  3. Measure and record the total battery float voltage and charging current. Verify proper float voltage is applied per the manufacturer.
  4. Measure and record the float voltage of each jar/cell.
  5. Measure and record the AC ripple voltage.
  6. Measure and record the AC ripple current.
  7. Measure and record the internal ohmic value of each jar.
  8. Provide a detailed written report noting any deficiencies and corrective action taken and/or required.

Predecessor Contract
Process

This solicitation is for State certified MBE dealers only.
The Ohio Department of Behavioral Health (DBH) will award this project to the lowest-cost responsive and responsible supplier. The awarded supplier must include all applicable costs for delivery, setup, and warranty in their submission.

Substitutions are not permitted unless explicitly authorized within the solicitation documentation.

All pricing must be clearly entered into the OhioBuys item grid. If a separate quote is submitted, the total must exactly match the amount listed in the item grid. Discrepancies may result in disqualification.

DBH reserves the right to purchase up to the full quantities specified in the sourcing project.

Important: All vendor inquiries must be submitted exclusively through the Inquiry Field in OhioBuys. Questions submitted through other channels will not be considered.

In the event of a tie bid, the sourcing project will be awarded to the first valid bid received by the date and time stamp in OhioBuys.

Ship To
P002264 DMH NORTHWEST OHIO PSYCH HOSP Toledo
Contracting Entity
DMH911010 TOL CHIEF EXECUTIVE OFFICER NOPH
1 Record(s)
0 Record(s)
Solicitation Documents
Keywords
Search Reset
0 Record(s)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.