Cowan Lake Dam Replacement
|
|
Synopsis:
|
|
WSA intends to engage a General Contractor to a) construct a new dam at the outlet of Cowan Lake, and b) demolish and remove the existing dam. The scope of work generally includes:
• Clearing & grubbing;
• Care of water including cofferdams and bypass channel;
• Earthworks;
• Piling;
• Cast-in-place concrete;
• Supply & installation of safety booms and associated anchors;
• Embankment construction including sheet piling;
• Supply & installation of radial and vertical lift gates and associated mechanical actuators;
• Supply & installation of precast concrete elements (bridge girders, box culverts);
• Supply & erection of pre-engineered metal building;
• Fabrication & installation of decking, railings, hoist monorails, stoplogs, trash racks, and other miscellaneous metals;
• Supply, installation and commissioning of monorail hoists;
• Electrical, instrumentation & controls;
• Supply and installation of chain link fencing;
• Supply and installation public safety signage; and
• Demolition and site restoration services including grass seeding
|
|
Additional Information:
|
|
WSA is a Treasury Board Crown corporation within the meaning of The Crown Corporations Act, 1993 (Saskatchewan) that is governed by The Water Security Agency Act (Saskatchewan). WSA is responsible for water management in the Province of Saskatchewan, which includes managing the Province’s water supply, protecting water quality, ensuring safe drinking water and the treatment of wastewater, reducing flood and drought damage, protecting aquatic habitat, and managing dams and related supply channels.
|
|
|
Competition Type:
|
Request for Proposal
|
|
|
|
|
|
|
|
Competition Documents
(Note: Opening the attached Tender Documents may result in your Organization Name and Province being included on an Interested Bidders List. The Interested Bidders List is live until the competition close date/time. The List is intended to facilitate potential partnerships and subcontracting opportunities to benefit the construction industry that may lead to better bidding)
:
|
|
|
|
|
|
|
RFP for Cowan Lake Dam Replacement
|
|
PDF
|
1.41 Mb
|
Added: Jan 26, 2026
|
|
|
|
|
|
|
Appendix E Prime Contractor Designation Letter
|
|
PDF
|
97.11 Kb
|
Added: Jan 23, 2026
|
|
|
|
|
|
|
Appendix C Pricing - Schedule of Prices Table
|
|
PDF
|
129.65 Kb
|
Added: Jan 23, 2026
|
|
|
|
|
|
|
Appendix B
|
|
PDF
|
86.06 Kb
|
Added: Jan 23, 2026
|
|
|
|
|
|
|
Appendix A - Form of Agreement
|
|
PDF
|
800.59 Kb
|
Added: Jan 23, 2026
|
|
|
|
|
|
|
|
Amendment Documents:
|
|
|
|
Addendum No. 1
|
|
PDF
|
1.23 Mb
|
Added: Jan 26, 2026
|
|
|
|
|
|
|
|
|
|
|
Response Address:
|
|
Water Security Agency
|
|
Submissions must be sent by email to wsa.tenders@kgsgroup.com with the competition title and number prominently indicated in the subject line and the full legal name of the respondent in the body of the email.
|
|
|
|
|
|
Contact:
|
|
Lee Peters, M.Eng., P.Eng., PMP
|
|
Phone:
|
|
Email:
wsa.inquiries@kgsgroup.com
|
Lee Peters, M.Eng., P.Eng., PMP
wsa.inquiries@kgsgroup.com
RFP-2025-26OE-0218
|
|
|
|
|
|