| Location: | Washington |
|---|---|
| Posted: | Mar 18, 2026 |
| Due: | Apr 14, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CIP 25-05 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project consists of improvements to the City's existing water system including installation of 12-inch and 8-inch water main and casings, the abandonment of existing small-diameter water main, the relocation and reconnection of existing water meters and services, and the removal and replacement of three fire hydrant assemblies. Additional work includes improvements to the existing stormwater system and construction of two ADA-compliant curb ramps.
Completed bid proposals should be delivered to City of Sumner - City Hall, 1104 Maple Street, Sumner, WA 98390.

With GovernmentContracts, you can:
...Bid Number: 26-19 Bid Title: 26-19 Austin Court Stormwater Improvements Category: Public Work... ...
Whatcom County
Bid Due: 6/16/2026
...demolition, site prep, earthwork, grading, asphalt concrete paving, electrical, communications, stormwater...
Spokane International Airport
Bid Due: 6/24/2026
...paving, concrete paving, roundabout construction, stormwater facilities, structures over Yelm Creek...
State Government of Washington
Bid Due: 6/24/2026
...and roadway approaches, Stormwater collection and treatment facilities, Pedestrian crossing...
Pierce County
Bid Due: 6/13/2026