| Location: | Washington |
|---|---|
| Posted: | Mar 18, 2026 |
| Due: | Apr 16, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 93-2025-0040 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project will replace the two (2) existing influent flow meters for the Salmon Creek Treatment Plant (SCTP), with associated electrical and controls modifications, and removal of one (1) sink and appurtenances. The work requires temporary sewer flow control and bypassing. All work will be in accordance with the Contract Plans and these Contract Provisions.
The engineer's estimate for this project is $420,000.

With GovernmentContracts, you can:
...signal and illumination systems, other electrical work, pavement marking, rumble strips, temporary... erosion ...
State Government of Washington
Bid Due: 7/08/2026
...modifications or replacements, electrical connections, controls integration, thermostats, and any required... system that ...
Quinault Indian Nation
Bid Due: 6/18/2026
...the existing motor control center in the pump station to contractor provided electrical ...
Pierce County
Bid Due: 6/10/2026
...with Damage Control concepts. This seismic renovation is the final phase of a ...
City of Seattle
Bid Due: 6/10/2026