| Location: | South Carolina |
|---|---|
| Posted: | Apr 1, 2025 |
| Due: | May 1, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-0008 |
| Publication URL: | To access bid details, please log in. |
Replace the existing roof covering on the Sludge Thickener Building at the Felix C. Davis Wastewater Treatment Plant. The goal is to remove and replace the existing mineral surfaced roll (MRS) roof covering and roof insulation with a new Thermoplastic Polyolefin Roof (TPO) over new roof insulation. The existing roof drains and cast iron conductor piping and insulation will be removed and replaced with new cast irons piping and insulation.

With GovernmentContracts, you can:
...Project Name: Design & Build Services Hangers W & Y at Downtown Airport ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/11/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Mosely... Designs Email: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Moseley Designs Email...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...19, 2026 - 2:00pm Project Location: Pendleton, SC Project Delivery Method: Design-Bid-Build... qualified ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/19/2026