| Location: | South Carolina |
|---|---|
| Posted: | Apr 1, 2025 |
| Due: | May 1, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-0008 |
| Publication URL: | To access bid details, please log in. |
Replace the existing roof covering on the Sludge Thickener Building at the Felix C. Davis Wastewater Treatment Plant. The goal is to remove and replace the existing mineral surfaced roll (MRS) roof covering and roof insulation with a new Thermoplastic Polyolefin Roof (TPO) over new roof insulation. The existing roof drains and cast iron conductor piping and insulation will be removed and replaced with new cast irons piping and insulation.

With GovernmentContracts, you can:
...Project Name: SCWSA WTP Sludge Dewatering System Agency/Owner: Saluda County Water and Sewer... ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/30/2026
...Project Name: CIP 2490 PWTP Sludge Removal System Replacement Agency/Owner: Beaufort - Jasper...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/11/2026
...Project: CIP-2490 PWTP Sludge Removal System Replacement Ref. #: 2027-RFP-002 Type: RFP Status... ...
Beaufort - Jasper Water & Sewer Authority
Bid Due: 8/11/2026