Chiller Replacement Project

Location: California
Posted: Aug 5, 2025
Due: Aug 28, 2025
Agency: Contra Costa County
Type of Government: State & Local
Category:
  • 41 - Refrigeration, Air Conditioning and Air Circulating Equip.
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Chiller Replacement Project
The project includes but is not limited to the replacement of three chillers and their related water pumps within the chiller plant. The chiller work also requires rerouting of piping within the chiller plant replacement and relocation of the chilled water expansion tank and installation of a new refrigerant leak detection system. All work will be phased in sequence to allow continuous operation of the facility in conjunction with. the furnish, installation & maintenance of an interim chiller and generator on site. To connect the inttirim equipment with the building mechanical and electrical systems, temporary connections and supports will be installed at the exterior of the building extending to the identified points of connection on the mechanical and electrical drawings within the building. All interim and tempora1y equipment and support systems are to be removed at project completion with the site and building restored to their original condition· refer to the drawings sheet notes and specifications for additional information. Bidders shall carefully review the phasing / sequencing requirements in the Contract Documents, including Exhibit A - Abbreviated Functional Program.
Order Remove Order hard copies for this entire project for $250.00

StatusAccepting Bids
Prebid Date 7/30/25 10:00am
Bid Date 8/28/25 2:00pm
Company & Contacts
Contra Costa County Public Works Department
Margaret Thorp
925-812-7484
Location

Contra Costa County, CA

The estimated construction contract cost (Base bid) is $7,200,000.00.

A mandatory pre-bid conference will be held on July 30, 2025, at 10:00 a.m., at the project site, 2500 Alhambra Ave., Martinez, CA 94553. The group will meet in the main Hospital Lobby. Discussion will cover recommended outreach efforts, resources, and any other subjects of interest to attendees.

Immediately following the pre-bid conference on July 30, 2025, there will be an in-person mandatory Job Site Visit at 2500 Alhambra Ave., Martinez, CA 94553.

**Because of the restrictive nature of the facilities, the site will only be open for inspection by bidders on July 30, 2025, as noted above.

Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...CHP Hayward Area office - Generator Maintenance Services - IFB #26C345003Details Event ID... ...

State Government of California

Bid Due: 6/11/2026

...Routine and Non-Routine Generator Inspection, Maintenance, and Repair Services in Mono, Inyo... 26101400 ...

State Government of California

Bid Due: 6/23/2026

...preventative maintenance and emergency repairs on two (2) emergency generators and associated automatic... ...

State Government of California

Bid Due: 6/11/2026

...Follow Z1DA--Correct Martinez and Mare Island Generator Fuel Lines Active Contract Opportunity... Business ...

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 6/24/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.