| Location: | California |
|---|---|
| Posted: | Apr 1, 2025 |
| Due: | Apr 17, 2025 |
| Agency: | County of San Joaquin |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Number | Deadline |
|
NA0017 Pipe Replacement - Deferred Maintenance Program
The work is located San Joaquin County near Lodi, California as well as near Stockton, California and is situated along Potter Creek, Mormon Slough, Bear Creek, Paddy Creek, North Paddy Creek, and Little John Creek.
The work, in general, consists of removing existing pipe penetrations through levees and replacing with reinforced concrete pipes, installing flap and slide/canal gates, reinforced concrete riser structures, and new reinforced concrete inlet/outlet structures as prescribed in the project plans and specifications. Base Estimate Range between $2,956,400 and $3,695,500 |
04/17/2025 08:31 PM UTC |

With GovernmentContracts, you can:
...Number Deadline Canal Boulevard, Delta Avenue and Laurel Avenue Resurfacing The work is ...
County of San Joaquin
Bid Due: 6/25/2026
...Project: Live Oak Canal Bridge Replacement at Sanders and Larkin Roads Ref. #: ...
Sutter County
Bid Due: 6/25/2026
...Project: Live Oak Canal Bridge Replacement at Sanders and Larkin Roads Ref. #: ...
Sutter County
Bid Due: 6/25/2026
...for the purpose of operating and maintaining the Friant-Kern Canal, (FKC), a component ...
Friant Water Authority
Bid Due: 6/26/2026