| Location: | North Carolina |
|---|---|
| Posted: | Oct 17, 2025 |
| Due: | Nov 12, 2025 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 281-FB2637 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 281-FB2637 |
| Project Title: | Piedmont Propulsion Structural Floor Infill |
| Description: | cope of work summary: modification of the existing 14,000 square foot First Floor Level storage space and the existing Basement Floor Level space below. The Scope of Work will create manufacturing space on both floor levels. The recessed steel framing floor structure will be dismantled and reinstalled at a higher elevation with new steel column extension pieces and footing as needed. New steel floor decking and a concrete slab floor system will be constructed to match the top of the existing First Floor Level perimeter slab. |
| Opening Date: | 11/12/2025 3:00 PM |
| Posted Date: | 10/17/2025 |
| Status: | Open |
| Department: | CITY OF WINSTON-SALEM |
|
Solicitation Number
*
281-FB2637
|
Department
CITY OF WINSTON-SALEM
|
Status Reason
Open
|
|
|
Opening Date
2025-11-12T15:00:00.0000000
|
Posted Date
*
2025-10-17T11:44:55.0000000Z
|
Commodity Code
Concrete installation and repair services
|
|
|
Mandatory Conference/Site Visit
2025-10-28T04:00:00.0000000Z
|
Special Instructions
Submit questions in writing to James Anderson at andersja@forsyth.cc.
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Owner
Russell Frye
|
|||
|
Description
cope of work summary: modification of the existing 14,000 square foot First Floor Level storage space and the existing Basement Floor Level space below. The Scope of Work will create manufacturing space on both floor levels. The recessed steel framing floor structure will be dismantled and reinstalled at a higher elevation with new steel column extension pieces and footing as needed. New steel floor decking and a concrete slab floor system will be constructed to match the top of the existing First Floor Level perimeter slab.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can:
..., Frames, Hardware WC21: Drywall, Framing, EIFS, Acoustical Ceilings, Wall Panels, & Foam...
North Carolina State University
Bid Due: 6/18/2026
.... Alternate 3 - Structure #17 consists of replacing the existing timber structure ...
State Government of North Carolina
Bid Due: 6/17/2026
...; Glazing - BP0920 - Drywall/Metal Framing - BP0930 - Hard Tile - ...
North Carolina State University
Bid Due: 6/12/2026
...- Structural Steel and Misc. Metals 1 06A - Finish Carpentry and Casework ...
State Government of North Carolina
Bid Due: 6/04/2026