| Location: | Virginia |
|---|---|
| Posted: | Feb 11, 2025 |
| Due: | Mar 5, 2025 |
| Agency: | State Government of Virginia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB 86420-1 |
| Publication URL: | To access bid details, please log in. |
| Document | Size | Description | Posted On | Type |
| Addendum 1 IFB86420.pdf | (234.92 KB) | Addendum No. 1 IFB-86420 | 2/11/25 | RFx Document |
| IFB Gunston Hall - Families in Focus FINAL.pdf | (493.27 KB) | Gunston Hall Families in Focus IFB-86420 | 2/7/25 | RFx Document |
| Families in Focus Full Design Files Attachment F (1)_Part1.pdf | (57.76 MB) | Families in Focus Full Design Pages 1-61 Attachment F | 2/7/25 | RFx Document |
| FiF Fabrication Scope of WorkGH - Attch A.pdf | (2.78 MB) | Gunston Hall Families In Focus Fabrication Project Attachment A | 2/7/25 | RFx Document |
| Families in Focus Full Design Files Attachment G_Part2.pdf | (58.71 MB) | Families in Focus Full Design Pages 62-122 Attachment G | 2/7/25 | RFx Document |

With GovernmentContracts, you can:
...DEA has a requirement for design, fabrication, and installation of an exhibit for ...
JUSTICE, DEPARTMENT OF
Bid Due: 7/31/2026
...will be accepted. The DEA has a requirement for design, fabrication, and installation ...
JUSTICE, DEPARTMENT OF
Bid Due: 7/31/2026
...for the design and fabrication of hazardous material storage modules to be installed ...
DEPT OF DEFENSE
Bid Due: 8/27/2026