| Location: | Georgia |
|---|---|
| Posted: | Jan 26, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Contract: | Awards |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912HN25B4007 |
| Publication URL: | To access bid details, please log in. |
This project is for the construction of a Consolidated Parachute Rigging Facility at Hunter Army Airfield, GA. The project includes parachute drying tower, packing lanes, overhead crane, parachute repair room, supply rooms, storage areas, and a classroom. Built-in building systems include fire alarm/mass notification, fire suppression, HVAC, energy management control system, electrical systems, communications networks, cable TV, intrusion detection, closed circuit surveillance, and electronic access control systems. Supporting facilities include site preparation, utilities, vehicle parking, access drives, curb and gutter, sidewalks, storm drainage, landscaping, and other site improvements.

With GovernmentContracts, you can:
...Removal & Trimming GRP 300 - Pavement Marking GRP 750 - FEMA Storm ...
Cobb County
Bid Due: 11/12/2026
..., Sewer and Storm Drain 91356 Construction, Utility and Underground Projects BuyerContact: Conner ...
State Government of Georgia
Bid Due: 11/05/2026
...-foot wide sidewalks. The project also includes the installation of drainage structures, storm...
Forsyth County
Bid Due: 10/29/2026
...; +- 3,024 linear feet of storm drain pipe of various sizes; +- ...
State Government of Georgia
Bid Due: 11/06/2026