| Location: | Georgia |
|---|---|
| Posted: | Jan 26, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Contract: | Awards |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912HN25B4007 |
| Publication URL: | To access bid details, please log in. |
This project is for the construction of a Consolidated Parachute Rigging Facility at Hunter Army Airfield, GA. The project includes parachute drying tower, packing lanes, overhead crane, parachute repair room, supply rooms, storage areas, and a classroom. Built-in building systems include fire alarm/mass notification, fire suppression, HVAC, energy management control system, electrical systems, communications networks, cable TV, intrusion detection, closed circuit surveillance, and electronic access control systems. Supporting facilities include site preparation, utilities, vehicle parking, access drives, curb and gutter, sidewalks, storm drainage, landscaping, and other site improvements.

With GovernmentContracts, you can:
...Drain 91381 Maintenance and Repair, Sewer and Storm Drain, Including Removal 91187 Storm ...
State Government of Georgia
Bid Due: 7/07/2026
...of the STORM DRAINAGE & STREET IMPROVEMENTS TO SERVE THE JOHNSON STREET, GARNETT ...
State Government of Georgia
Bid Due: 6/09/2026
...Consulting Services (Not Otherwise Classified) 91187 Storm Drainage 90740 Engineering Services, Non... RFQ-484-061526 ...
State Government of Georgia
Bid Due: 6/15/2026
...91187 Storm Drainage 91345 Construction, Sewer and Storm Drain 91381 Maintenance and Repair, ...
State Government of Georgia
Bid Due: 6/26/2026