| Location: | Federal |
|---|---|
| Posted: | Feb 12, 2025 |
| Due: | Feb 12, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: | |
| Solicitation No: | PAN41125P0000001873 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Provide Installation, Test, Maintenance, and Repair (ITMR) support to communications Layer 1 of the Open Systems Interconnection model (OSI model) modifications and additions to the existing copper Plain Old Telephone Switch (POTS), Inside Plant (ISP) Fiber Optic Cabling, CAT5E/6 cable plant(s), and Outside Plant (OSP) Copper/Fiber optic cabling for four (4) United States military Co-located Operating Bases (COB); Daegu, Gimhae, Gwangju, and Suwon Air Bases in South Korea.
Scheduling And Quality Control
• Installation, Test, Maintenance, And Repair (ITMR) For Outside Plant and Inside Plant (Copper and/or Fiber
Optic) Cabling
• Use Of Communication Infrastructure Test Equipment, Specialized Tools (I.E. GPS equipment, fiber
splicers, visual fault locators, Optical Time-Domain Reflectometers, etc.), and Knowledge on Installation
Standard Practices.
• Cable Splicing, Sealing, and Termination
• Working Aloft and Climbing
• Safety Procedures
• Aerial, Underground, And Buried Cabling Systems
• Conduit and Duct Installation
• Grounding and Bonding
• Cable Management and Marking
• LAN/WAN Distribution
• Telephone Devices Installation and Maintenance
• Utilize Publications and Directives (Telecommunications Industry Association (TIA) Standards and Unified
Facilities Criteria (UFC), Etc.)
• Installation Of Half, Full, And Wall Mounted Server Racks
• Maps, Records, Documentation, And Diagrams (using CVC, WOMS, IMDS, and Remedy)
• Plans, Planning, Agreements, And Technical Solutions
• Projects And Requirements, Military Construction (MILCON), Renovations, Work Orders, And Site Surveys
• Preventative Maintenance Inspections
• Cleanup And Restoration
• Deliverables
| Mar 26, 2025 | [Sources Sought (Updated)] Communication Infrastructure Installation, Test, Maintenance, and Repair services (ITMR) info alert Note: There have been new actions to this contract opportunity. To view the most recent action, please click here . |
| Mar 27, 2025 | [Sources Sought (Updated)] Communication Infrastructure Installation, Test, Maintenance, and Repair services (ITMR) |

With GovernmentContracts, you can:
...Follow GPS ENABLED TROLLING MOTORS Active Contract Opportunity Notice ID 140G0126Q0223 Related... a ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 7/29/2026
...Follow Repair of Inertial EMB, GPS Active Contract Opportunity Notice ID 70Z03826QH0000079 Related... ...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 7/28/2026
...for: Specracom SecureSync 2400 GPS Time Synchronization modules - Qty 1 EA To ...
DEPT OF DEFENSE
Bid Due: 7/27/2026
...Tactical Modem. (Detachable) GPS Receiver. (Detachable) Fire Control Computer....
DEPT OF DEFENSE
Bid Due: 8/08/2026