J045--Steam Line Insulation and Jacketing

Location: Arkansas
Posted: Nov 13, 2025
Due: Nov 28, 2025
Agency: VETERANS AFFAIRS, DEPARTMENT OF
Type of Government: Federal
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
Solicitation No: 36C25626Q0122
Publication URL: To access bid details, please log in.
Follow
J045--Steam Line Insulation and Jacketing
Active
Contract Opportunity
Notice ID
36C25626Q0122
Related Notice
Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
256-NETWORK CONTRACT OFFICE 16 (36C256)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
  • Updated Published Date: Nov 13, 2025 03:29 pm CST
  • Original Published Date: Nov 05, 2025 07:58 am CST
  • Updated Date Offers Due: Nov 28, 2025 08:00 am CST
  • Original Date Offers Due: Nov 18, 2025 08:00 am CST
  • Inactive Policy: Manual
  • Updated Inactive Date: Dec 28, 2025
  • Original Inactive Date: Dec 18, 2025
  • Initiative:
    • None
Classification View Changes
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: J045 - MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT
  • NAICS Code:
    • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
  • Place of Performance:
    DEPARTMENT OF VETERANS AFFAIRS CENTRAL ARKANSAS VETERANS HEALTHCARE SYSTEM NORTH LITTLE ROCK , 72114
Description View Changes
CONTRACT OPPORTUNITIES 36C25626Q0122 - Steam Line Insulation and Jacketing

The purpose of this amendment is to:
1) Extend the due date for responses from 11/18/25 to 8:00am (CST) 11/28/25;
2) provide responses to vendors questions; and
3) to include a site visit to provide prospective contractors with an opportunity to look at the locations for the steam line insulation and jacketing and determine their performance strategy for accomplishing the requirement. The site visit will be advantageous to the contractors in submitting a well-informed proposal.

The site visit is scheduled for 11:00 am (CST) November 21, 2025.
Place: 2200 Fort Roots Drive, North Little Rock, AR 72214 - Building 170.
Point of Contact: Justin Harper
501-257-5307
Justin.harper2@va.gov

Interested parties shall provide the contact information via email to arlene.blade@va.gov of the person(s) attending the site visit to the Contracting Officer no later than 12 pm (CST) 11/20/2025.
See attached map for meeting location.
Vendor Questions:
Question: How much pipe and what size pipe is in the trench?
Answer: The steam pipes are 1-1/4 and the condensate pipes are 2 .
Question: How much pipe and what size pipe is in the tunnel?
Answer: For pipe count, obtain this information at the site visit.
Question: Is there a count of number of elbows, valves, flanges, etc.. that would need to be insulated as well?
Answer: There are only ten elbows that need to be insulated.
Question: Should aluminum jacketing be applied to the full 240 feet (steam and condensate combined), or only to the 120 feet of the Building 111 trench section?
Answer: Aluminum jacketing for the full 240 ft. (See attached specifications).
Question: What is the size (diameter) of the steam and condensate piping, or are there building plans/drawings available that show these details
Answer: 1 ¼ steam and 2 condensate

Question: Could you please clarify whether the work area is a basement-level tunnel or fully underground trench?

Answer: It s in a concrete tunnel that has removable lids. See attached pictures.

Question: What is the anticipated project start date and expected duration or completion time frame once awarded?

Your Answer: We want to get the pipes insulated before they start freezing. 30 days from the award date?

Attachments/Links
Contact Information View Changes
Contracting Office Address
  • 715 SOUTH PEAR ORCHARD RD., PLAZA 1
  • RIDGELAND , MS 39157
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

Nov 5, 2025[Combined Synopsis/Solicitation (Original)] J045--Steam Line Insulation and Jacketing
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.