| Location: | South Carolina |
|---|---|
| Posted: | May 16, 2025 |
| Due: | Jun 10, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | H24-9656-LC |
| Publication URL: | To access bid details, please log in. |
Re-bid with revisions: sitework, landscaping, structural systems, fire protection, mechanical, electrical, and plumbing systems. The scope includes full interior demolition and selective exterior demolition. Phasing Requirement - The first floor office space (approximately 9,500 square feet must be completed by November 15, 2025) Bidders are required to identify this portion in their proposals and include it as a separate phase in their schedule.

With GovernmentContracts, you can:
...Method: Design-Bid-Build Construction Cost Range: $2,000,000 to $2,500,000 Agency Project Coordinator... suspended ceilings, ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: $1,750,000 to $2,250,000 Agency Project... in a ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026
...:00pm Project Location: 4700 Broad River Road, Columbia SC Project Delivery Method: Design-Bid-Build...-filter, ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/06/2026
...elevation boardwalk and structures; electrical and mechanical improvements; plumbing; playground.../contractors for Construction Manager ...
City of Clemson
Bid Due: 6/30/2026