| Location: | Connecticut |
|---|---|
| Posted: | May 1, 2025 |
| Due: | Jun 12, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PWC 25-33 |
| Publication URL: | To access bid details, please log in. |
Sealed bids for "ROUTE 1 SIDEWALK EXTENSION KINGS HIGHWAY TO BRIDGE ST" will be received by the Town of Groton at the Town Hall Annex, 134 Groton Long Point Road (across from R. E. Fitch High School) Groton, CT until 2:00 p.m., prevailing time, on June 12, 2025, and then at said office publicly opened and read aloud. Bids must be enclosed in a sealed envelope and designated as bid for “ROUTE 1 SIDEWALK EXTENSION KINGS HIGHWAY TO BRIDGE ST".
Karl Klein 45 Fort Hill Rd. Groton CT, 06340 United States Tel: 860-441-6681 Fax: kklein@groton-ct.gov

With GovernmentContracts, you can:
...Rental of Services and Equipment for Roadway Construction This Contract is for the ...
State Government of Connecticut
Bid Due: 8/18/2026
...Invitation to Bid for Construction Services 450 Columbus Blvd. Building/Agency Space Consolidation... Information ...
State Government of Connecticut
Bid Due: 9/02/2026
...Invitation to Bid for Construction Services DESPP Fleet Roof Replacement 47 Mill Hill ...
State Government of Connecticut
Bid Due: 8/24/2026
...Location 207536 caeab9a1-c1a3-4f22-8516-d54e4115374a 2027.0032 City Bid - Construction of Food..., Construction Manager, (203)-977-4179 ...
City of Stamford
Bid Due: 8/20/2026