| VIEW KEY MECHANICAL RENOVATION NOTES: PIPING GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED 1. PIPE DRAIN LINES FROM EQUIPMENT TO NEAREST FLOOR DRAIN.
NAME LEVEL NAME 1 KEYNOTE: INDICATES NOTE USED TO TO VENTILATION & PIPING. 2. INSTALL ALL REFRIGERANT LIQUID AND SUCTION PIPING SIZED PER EQUIPMENT
10'-0" HEIGHT ABOVE DESCRIBE ADDITIONAL INFORMATION MANUFACTURER RECOMMENDATIONS.
PROJECT 0'-0" ABOUT WORK REQUIRED, SPECIFIC
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
TO THE SHEET AND/OR DETAIL
SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND VENTILATION GENERAL NOTES:
REPORT ANY CONFLICTS BEFORE PROCEEDING.
INDICATES DIRECTION OF TRUE NORTH 2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS 1. UNLESS NOTED OTHERWISE, DUCT SIZES SHOWN ON DRAWINGS ARE INSIDE CLEAR
BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK. DIMENSIONS. MAINTAIN CLEAR DIMENSIONS INSIDE ANY LINING
PLAN OR DETAIL NUMBER 3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE 2. PROVIDE ACCESS DOORS AT ALL DUCT MOUNTED EQUIPMENT.
PLAN OR DETAIL NAME FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD 3. EXISTING AIR INLET AND OUTLET CFM SHOWN ON DRAWINGS ARE FROM EXISTING
CONDITIONS. DRAWINGS, AND ARE FOR REFERENCE ONLY. CONTRACTOR SHALL USE PRE-BALANCE
VIEW NAME 4. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF VALUES, AND NOT EXISTING CFM SHOWN ON DRAWINGS.
WALLS AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS. 4. CONTRACTOR MAY REUSE PORTIONS OF EXISTING DUCT PROVIDED SIZES AND PRESSURE
1
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CLASSES ARE CORRECT, DUCT IS THOROUGHLY CLEANED AND FREE OF DEFECTS, AND ALL
1/8" = 1'-0" CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS ARE SEALED
N H PLAN OR DETAIL SCALE CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO AS SPECIFIED FOR NEW DUCTWORK.
O RT BIDDING.
6. WHERE EXISTING MECHANICAL SYSTEMS DIFFER FROM THOSE SHOWN ON THE PROJECT MECHANICAL GENERAL NOTES:
DRAWINGS AND CREATE CONFLICTS WITH NEW EQUIPMENT, PIPING, OR DUCTWORK
INDICATES SIMILAR DETAIL REFERENCED INSTALLATIONS, THE CONTRACTOR SHALL PROVIDE DETAILED DOCUMENTATION (SUCH AS
IN MULTIPLE LOCATIONS SKETCHES, PHOTOS, AND DIMENSIONS) ALONG WITH RECOMMENDATIONS TO RESOLVE THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
SIM SIM
THE CONFLICT. THIS INFORMATION MUST BE SUBMITTED TO THE ENGINEER FOR REVIEW TO VENTILATION, & PIPING.
DETAIL REFERRED TO BY SECTION CUT 1 AND APPROVAL. NO WORK RELATED TO THE CONFLICT SHALL PROCEED UNTIL AN
1 4 2
3 APPROVED RESOLUTION IS PROVIDED BY THE ENGINEER. 1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
M101 SHEET DETAIL IS LOCATED ON T101 7. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
REMAIN ACTIVE. AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
LINE TYPE AND TAG KEY: 8. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
NEW WORK BY THIS CONTRACTOR (WIDE LINE) SYSTEMS ARE INSTALLED. 2. CATALOG AND MODEL NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN
NEW 9. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR AS AN AID TO THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR
EXISTING TO BE REMOVED (SHORT DASHED PATTERN) TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND IS RESPONSIBLE FOR THE COMPLETE DESCRIPTION OF MATERIAL SCHEDULED ON THESE
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN) CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY DRAWINGS AND IN THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE
DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE. MATERIAL AND SCHEDULED PERFORMANCE TAKES PRECEDENCE OVER THE MODEL
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE) 10. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT NUMBER. THE FIRST MANUFACTURER SCHEDULED IS THE BASIS OF DESIGN.
EXISTING THAT HAS BEEN REMOVED. 3. DETERMINATION OF QUANTITIES OF MATERIAL AND EQUIPMENT REQUIRED SHALL BE MADE
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN) 11. PROPERLY RECLAIM AND DISPOSE OF ALL REFRIGERANT IN REMOVED EQUIPMENT/ BY THE CONTRACTOR FROM THE DOCUMENTS. WHERE MATERIAL AND/OR QUANTITY
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN) REFRIGERANT PIPING. RECLAIMED REFRIGERANT SHALL HAVE DOCUMENTATION AS DISCREPANCIES ARISE BETWEEN DRAWINGS, SCHEDULES AND/OR SPECIFICATIONS, THE
REQUIRED BY THE AUTHORITY HAVING JURISDICTION (AHJ). HIGHER QUALITY/ GREATER NUMBER SHALL GOVERN.
HALFTONING DOES NOT MODIFY SCOPE. 4. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
5. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
SYMBOL LIST - PIPING SYSTEMS
INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL SYMBOL DESCRIPTION o F FLUID TYPE OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
DPP DRAIN - PIPING WITH FABRICATION OR EQUIPMENT ORDERS.
HWR HEATING WATER RETURN 150 Water 6. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
HWS HEATING WATER SUPPLY 180 Water
ACCESS.
LIQ REFRIGERANT LIQUID 120 Water
7. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
FIRE / SMOKE BARRIER DESIGNATIONS SUC REFRIGERANT SUCTION 35 Water COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO OTHERS.
FIRE AND SMOKE SEPARATIONS ARE NOT SHOWN ON THESE DOCUMENTS. CONTRACTOR SHALL 8. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
REVIEW THE ARCHITECTURAL PLANS AND DETERMINE THE LOCATIONS OF ALL FIRE AND SMOKE CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
PARTITIONS, BARRIERS, AND WALLS. THIS INCLUDES FLOOR RATINGS. PRICING SHALL INCLUDE DESIGN.
HVAC ABBREVIATION KEY
ALL MATERIALS AND LABOR REQUIRED TO MAINTAIN THE RATINGS OF ALL RATED SEPARATIONS, 9. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
WHETHER SHOWN ON THE ENGINEERING PLANS OR NOT. FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
ABBR: DESCRIPTION:
FINISH.
10. SEAL ALL FLOOR & WALL PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING, AND DUCTS
AFF ABOVE FINISHED FLOOR PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS SHALL BE SEALED AIRTIGHT WITH
WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER FOR OUTDOOR USE.
APPLICABLE CODES CO CLEANOUT
11. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
DN DOWN
OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS NIC NOT IN CONTRACT RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING: 12. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
SCCR SHORT CIRCUIT CURRENT RATING
BUILDING CODE: IBC 2024 EDITION MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
TYP TYPICAL
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
UON UNLESS OTHERWISE NOTED PIPING, DUCTWORK, ETC.
FIRE CODE: IFC 2024 EDITION 13. DO NOT BLOCK EQUIPMENT SERVICE CLEARANCES.
14. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3'-6"IN FRONT OF ALL ELECTRICAL
EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT
PLUMBING CODE: UPC 2021 EDITION LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,
TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.
DUCT ABBREVIATION KEY
15. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THEWIDTH / DEPTH
MECHANICAL CODE: IMC 2021 EDITION OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6'-0"ABOVE THE
ABBR. DESCRIPTION EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO
EA EXHAUST AIR THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICATED
ELECTRICAL CODE: NFPA 70 (NEC) 2023 EDITION OA OUTSIDE AIR ELECTRICAL SPACE INCLUDING: DUCTWORK, PIPING, ETC.
SA SUPPLY AIR
TAB PRE-DEMOLITION NOTES:
ENERGY CONSERVATION CODE: IECC 2012
1. BEFORE ANY DEMOLITION WORK IS BEGUN, AN AIR BALANCE TEST SHALL BE PERFORMED
LOCAL BUILDING CODE: CURRENT EDITION CONTACT PERSONS: BY THE TESTING, ADJUSTING AND BALANCING (TAB) CONTRACTOR FOR EQUIPMENT AND
DEVICES AS INDICATED ON THE DRAWINGS.
2. PROVIDE DUCT TRAVERSE READINGS AT LOCATIONS DESIGNATED ON THE DRAWINGS.
DESCRIPTION: PERSON: A. IN THE EVENT A DUCT TRAVERSE LOCATION AS MARKED ON THIS PLAN IS
INACCESSIBLE FOR MEASUREMENT, THE TAB CONTRACTOR SHALL PERFORM THE
PROJECT MANAGER NATE JACQUES TRAVERSE AT AN ALTERNATE LOCATION OR SHALL TAKE MULTIPLE DUCT
CONTRACTOR ABBREVIATION KEY
TRAVERSES AND/OR READINGS AS REQUIRED TO DETERMINE THE AIRFLOW
MECHANICAL EVAN HAMMER READING WHERE THE DUCT TRAVERSE SYMBOL IS SHOWN. IN THE EVENT
TRAVERSES ARE TAKEN AT ALTERNATE LOCATION(S), TAB CONTRACTOR SHALL
ABBR: DESCRIPTION:
ELECTRICAL TONY DELOUIS INCLUDE A DRAWING THAT SHOWS THE LOCATIONS WHERE THE ACTUAL
MEASUREMENTS WERE TAKEN.
A.C. ASBESTOS ABATEMENT CONTRACTOR B. TAKE A DUCT STATIC PRESSURE READING AT EACH LOCATION WHERE A DUCT
TRAVERSE READING IS TAKEN AND INCLUDE IN THE FINAL PRE-DEMOLITION TAB
A.V.C. AUDIO/VISUAL CONTRACTOR
REPORT.
C.C. CIVIL CONTRACTOR 3. TAB CONTRACTOR SHALL COMPILE AND SUBMIT THE FINAL PRE-DEMOLITION REPORT
WITHIN 10 WORKING DAYS AFTER THE FIELD MEASUREMENTS ARE COMPLETED. FINAL TAB
C.M. CONSTRUCTION MANAGER
REPORT SHALL BE SUBMITTED FOR REVIEW TO THE ARCHITECT/ENGINEER. TESTING SHALL
E.C. ELECTRICAL CONTRACTOR INCLUDE ALL ITEMS REQUIRED IN THE SPECIFICATIONS.
F.P.C. FIRE PROTECTION CONTRACTOR
TAB POST-CONSTRUCTION NOTES:
F.S.C. FOOD SERVICE CONTRACTOR
G.C. GENERAL CONTRACTOR 1. AFTER CONSTRUCTION ACTIVITIES ARE COMPLETE, TESTING, ADJUSTING (TAB) AND
BALANCING CONTRACTOR SHALL REBALANCE AIR HANDLING UNITS AS REQUIRED TO
H.C. HEATING CONTRACTOR ACHIEVE THE NEW AIRFLOW VALUES SHOWN ON THE CONSTRUCTION DRAWINGS.
2. AREAS SERVED BY THIS EQUIPMENT WHICH WERE NOT RENOVATED SHALL BE RE-
M.C. MECHANICAL CONTRACTOR
BALANCED TO THE AIRFLOW RATES MEASURED BEFORE THE RENOVATION OCCURRED
N.C.C. NURSE CALL CONTRACTOR (REFER TO THE FINAL PRE-DEMOLITION REPORT).
3. IF DUCT TRAVERSE LOCATION AS MARKED ON THE DRAWINGS IS INACCESSIBLE FOR
P.C. PLUMBING CONTRACTOR
MEASUREMENT, THE TAB CONTRACTOR SHALL PERFORM THE TRAVERSE AT AN ALTERNATE
LOCATION OR SHALL TAKE MULTIPLE DUCT TRAVERSES AND/OR GRILLE READINGS AS
S.C. SECURITY CONTRACTOR
REQUIRED TO DETERMINE THE FLOW RATE. IN THE EVENT TRAVERSES ARE TAKEN AT AN
T.C. TECHNOLOGY CONTRACTOR ALTERNATE LOCATION(S), TAB CONTRACTOR SHALL INCLUDE A DRAWING THAT SHOWS THE
LOCATIONS WHERE THE ACTUAL MEASUREMENTS WERE TAKEN.
T.C.C. TEMPERATURE CONTROLS CONTRACTOR
4. A DUCT STATIC PRESSURE READING SHALL BE TAKEN AT EACH LOCATION WHERE A DUCT
TRAVERSE READING IS TAKEN AND SHALL BE INCLUDED IN THE FINAL POST-CONSTRUCTION
V.C. VENTILATION CONTRACTOR
TAB REPORT.
5. TAB CONTRACTOR SHALL COMPILE AND SUBMIT COPIES OF THE FINAL POST-
CONSTRUCTION TAB REPORT AS REQUIRED BY SECTION 23 05 93.
6. THE FINAL POST CONSTRUCTION REPORT SHALL INCLUDE ALL ITEMS REQUIRED IN THE
SPECIFICATIONS.
HVAC SHEET INDEX
M000 HVAC COVERSHEET
M100 BASEMENT DEMOLITION PLAN - HVAC
M101 LEVEL 01 DEMOLITION PLAN - HVAC
M102 LEVEL 02 DEMOLITION PLAN - HVAC
M210 BASEMENT PLAN - VENTILATION
M211 LEVEL 01 PLAN - VENTILATION
M212 LEVEL 02 PLAN - VENTILATION
M400 HVAC DETAILS
M500 HVAC SCHEDULES
GRAND TOTAL: 9 |
|
| IDAS 9501.00 DOC NCCF |
| AIR HANDLER |
| REPLACEMENT |
|
VIEW KEY |
|
|
| NAME LEVEL NAME
10'-0" HEIGHT ABOVE
PROJECT 0'-0" |
|
1 KEYNOTE: INDICATES NOTE USED TO
DESCRIBE ADDITIONAL INFORMATION
ABOUT WORK REQUIRED, SPECIFIC
TO THE SHEET AND/OR DETAIL |
|
| INDICATES DIRECTION OF TRUE NORTH
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
VIEW NAME
1
1/8" = 1'-0"
N H PLAN OR DETAIL SCALE
O RT |
|
|
|
| INDICATES SIMILAR DETAIL REFERENCED
IN MULTIPLE LOCATIONS
SIM SIM
DETAIL REFERRED TO BY SECTION CUT 1
1 4 2
3
M101 SHEET DETAIL IS LOCATED ON T101 |
|
|
|
| LINE TYPE AND TAG KEY:
NEW WORK BY THIS CONTRACTOR (WIDE LINE)
NEW
EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
EXISTING
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
HALFTONING DOES NOT MODIFY SCOPE.
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING
TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL
INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL |
|
|
|
| DESCRIBE ADDITIONAL INFORMATION |
| ABOUT WORK REQUIRED, SPECIFIC |
| TO THE SHEET AND/OR DETAIL |
| EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD |
| SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND |
| REPORT ANY CONFLICTS BEFORE PROCEEDING. |
| NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS |
| 313 LANEDALE |
| ROCKWELL CITY, IOWA 50579 |
| DIMENSIONS. MAINTAIN CLEAR DIMENSIONS INSIDE ANY LINING |
| PROVIDE ACCESS DOORS AT ALL DUCT MOUNTED EQUIPMENT. |
| EXISTING AIR INLET AND OUTLET CFM SHOWN ON DRAWINGS ARE FROM EXISTING |
| DRAWINGS, AND ARE FOR REFERENCE ONLY. CONTRACTOR SHALL USE PRE |
| VALUES, AND NOT EXISTING CFM SHOWN ON DRAWINGS. |
| CONTRACTOR MAY REUSE PORTIONS OF EXISTING DUCT PROVIDED SIZES AND PRESSUR |
| CLASSES ARE CORRECT, DUCT IS THOROUGHLY CLEANED AND FREE OF DEFECTS, AND
TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS ARE SEAL |
| AS SPECIFIED FOR NEW DUCTWORK. |
| CONDITIONS. |
| THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF |
| CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO |
| BIDDING. |
| WHERE EXISTING MECHANICAL SYSTEMS DIFFER FROM THOSE SHOWN ON THE PROJECT |
| DRAWINGS AND CREATE CONFLICTS WITH NEW EQUIPMENT, PIPING, OR DUCTWORK |
| INSTALLATIONS, THE CONTRACTOR SHALL PROVIDE DETAILED DOCUMENTATION (SUCH AS |
| REMAIN ACTIVE. |
| OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY |
| REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW |
| SYSTEMS ARE INSTALLED. |
| MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR |
| TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND |
| AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE |
| INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING |
| CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT. |
| CATALOG AND MODEL NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVE |
| AS AN AID TO THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACT |
| IS RESPONSIBLE FOR THE COMPLETE DESCRIPTION OF MATERIAL SCHEDULED ON THESE |
| DRAWINGS AND IN THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE |
|
DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE. |
| 10. |
DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT |
|
THAT HAS BEEN REMOVED. |
| 11. |
|
|
REFRIGERANT PIPING. RECLAIMED REFRIGERANT SHALL HAVE DOCUMENTATION AS |
|
REQUIRED BY THE AUTHORITY HAVING JURISDICTION (AHJ). |
| NUMBER. THE FIRST MANUFACTURER SCHEDULED IS THE BASIS OF DESIGN |
| DETERMINATION OF QUANTITIES OF MATERIAL AND EQUIPMENT REQUIRED SHALL BE MA |
| BY THE CONTRACTOR FROM THE DOCUMENTS. WHERE MATERIAL AND/OR QUANTITY |
| DISCREPANCIES ARISE BETWEEN DRAWINGS, SCHEDULES AND/OR SPECIFICATIONS, THE |
| HIGHER QUALITY/ GREATER NUMBER SHALL GOVERN. |
| DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM |
| ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR |
| PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES. |
| COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE |
| STING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN) |
| STING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN) |
| DERLINED TAG INDICATES OBJECT IS IN |
- |
SCOPE. IF NEW, ADDITIONAL |
| ORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST |
|
|
| SYMBOL LIST - PIPING SYSTEMS |
|
|
|
| SYMBOL |
DESCRIPTION |
o F |
FLUID TYPE |
| DPP |
DRAIN - PIPING |
|
|
| HWR |
HEATING WATER RETURN |
150 |
Water |
| HWS |
HEATING WATER SUPPLY |
180 |
Water |
| LIQ |
REFRIGERANT LIQUID |
120 |
Water |
| SUC |
REFRIGERANT SUCTION |
35 |
Water |
| VERIFY NON-I |
NTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO |
| VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENC |
|
| OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING |
|
| FIRE / SMOKE BARRIER DESIGNATIONS |
| FIRE AND SMOKE SEPARATIONS ARE NOT SHOWN ON THESE DOCUMENTS. CONTRACTOR SHALL
REVIEW THE ARCHITECTURAL PLANS AND DETERMINE THE LOCATIONS OF ALL FIRE AND SMOKE
PARTITIONS, BARRIERS, AND WALLS. THIS INCLUDES FLOOR RATINGS. PRICING SHALL INCLUDE
ALL MATERIALS AND LABOR REQUIRED TO MAINTAIN THE RATINGS OF ALL RATED SEPARATIONS,
WHETHER SHOWN ON THE ENGINEERING PLANS OR NOT. |
| REVIEW THE ARCHITECTURAL PLANS AND DETERMINE THE LOCATIONS OF ALL FIRE AND SMOKE |
| PARTITIONS, BARRIERS, AND WALLS. THIS INCLUDES FLOOR RATINGS. PRICING SHALL INCLUDE |
| ALL MATERIALS AND LABOR REQUIRED TO MAINTAIN THE RATINGS OF ALL RATED SEPARATIONS, |
| WHETHER SHOWN ON THE ENGINEERING PLANS OR NOT. |
| HVAC ABBREVIATION KEY |
|
| ABBR: |
DESCRIPTION: |
| AFF
CO
DN
NIC
SCCR
TYP
UON |
ABOVE FINISHED FLOOR
CLEANOUT
DOWN
NOT IN CONTRACT
SHORT CIRCUIT CURRENT RATING
TYPICAL
UNLESS OTHERWISE NOTED |
| DESIGN. |
| EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALL |
|
FINISH. |
| 10. |
SEAL ALL FLOOR & WALL PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING, AND DUCT |
|
PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS SHALL BE SEALED AIRTIGHT W |
|
WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER FOR OUTDOOR USE. |
| 11. |
WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED |
|
OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH |
|
RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT. |
| 12. |
EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT |
| ABOVE FINISHED FLOOR |
| CLEANOUT |
| APPLICABLE CODES |
| CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS
INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING: |
| BUILDING CODE: IBC 2024 EDITION
FIRE CODE: IFC 2024 EDITION
PLUMBING CODE: UPC 2021 EDITION
MECHANICAL CODE: IMC 2021 EDITION
ELECTRICAL CODE: NFPA 70 (NEC) 2023 EDITION
ENERGY CONSERVATION CODE: IECC 2012
LOCAL BUILDING CODE: CURRENT EDITION |
|
PIPING, DUCTWORK, ETC. |
|
|
|
|
|
| 13. |
DO NOT BLOCK EQUIPMENT SERVICE CLEARANCES. |
|
|
|
|
|
| 14. |
MAINTAIN A MINIMUM WORKING CLEARANCE OF 3' |
-6 |
" |
IN FRONT OF ALL ELECTRICA |
|
|
|
EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDI |
|
|
|
|
NG BUT NOT |
|
LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONT |
|
|
|
|
ROL CENTER |
|
TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS |
|
|
|
|
|
| 15. |
MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE |
|
|
|
|
WIDTH / DEP |
|
OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6' |
|
|
|
-0 |
"ABOVE THE |
|
EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEM |
|
|
|
|
S FOREIGN T |
|
THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICA |
|
|
|
|
TED |
|
ELECTRICAL SPACE INCLUDING: DUCTWORK, PIPING, ETC. |
|
|
|
|
|
| DUCT ABBREVIATION KEY |
|
| ABBR. DESCRIPTION |
|
| EA |
EXHAUST AIR |
| OA |
OUTSIDE AIR |
| SA |
SUPPLY AIR |
| BEFORE ANY DEMOLITION WORK IS BEGUN, AN AIR BALANCE TEST SHALL BE PERFORME |
| BY THE TESTING, ADJUSTING AND BALANCING (TAB) CONTRACTOR FOR EQUIPMENT AND |
| DEVICES AS INDICATED ON THE DRAWINGS. |
| CONTACT PERSONS: |
|
| DESCRIPTION: |
PERSON: |
| PROJECT MANAGER
MECHANICAL
ELECTRICAL |
NATE JACQUES
EVAN HAMMER
TONY DELOUIS |
| IN THE EVENT A DUCT TRAVERSE LOCATION AS MARKED ON THIS PLAN IS |
| INACCESSIBLE FOR MEASUREMENT, THE TAB CONTRACTOR SHALL PERFORM TH |
| TRAVERSE AT AN ALTERNATE LOCATION OR SHALL TAKE MULTIPLE DUCT |
| CONTRACTOR ABBREVIATION KEY |
|
| ABBR: |
DESCRIPTION: |
| A.C.
A.V.C.
C.C.
C.M.
E.C.
F.P.C.
F.S.C.
G.C.
H.C.
M.C.
N.C.C.
P.C.
S.C.
T.C.
T.C.C.
V.C. |
ASBESTOS ABATEMENT CONTRACTOR
AUDIO/VISUAL CONTRACTOR
CIVIL CONTRACTOR
CONSTRUCTION MANAGER
ELECTRICAL CONTRACTOR
FIRE PROTECTION CONTRACTOR
FOOD SERVICE CONTRACTOR
GENERAL CONTRACTOR
HEATING CONTRACTOR
MECHANICAL CONTRACTOR
NURSE CALL CONTRACTOR
PLUMBING CONTRACTOR
SECURITY CONTRACTOR
TECHNOLOGY CONTRACTOR
TEMPERATURE CONTROLS CONTRACTOR
VENTILATION CONTRACTOR |
| TRAVERSE READING IS TAKEN AND INCLUDE IN THE FINAL PRE |
- |
| REPORT. |
|
| TAB CONTRACTOR SHALL COMPILE AND SUBMIT THE FINAL PRE |
- |
| WITHIN 10 WORKING DAYS AFTER THE FIELD MEASUREMENTS ARE COMPLETED. FINAL TA |
|
| REPORT SHALL BE SUBMITTED FOR REVIEW TO THE ARCHITECT/ENGINEER. TESTING SHA |
|
| INCLUDE ALL ITEMS REQUIRED IN THE SPECIFICATIONS. |
|
| TAB POST |
- |
CONSTRUCTION NOTES: |
| ACHIEVE THE NEW AIRFLOW VALUES SHOWN ON THE CONSTRUCTION DRAWINGS |
| AREAS SERVED BY THIS EQUIPMENT WHICH WERE NOT RENOVATED SHALL BE RE |
| (REFER TO THE FINAL PRE |
- |
DEMOLITION REPORT) |
| MEASUREMENT, THE TAB CONTRACTOR SHALL PERFORM THE TRAVERSE AT AN ALTERN |
|
| LOCATION OR SHALL TAKE MULTIPLE DUCT TRAVERSES AND/OR GRILLE READINGS AS |
|
| REQUIRED TO DETERMINE THE FLOW RATE. IN THE EVENT TRAVERSES ARE TAKEN AT AN |
|
| ALTERNATE LOCATION(S), TAB CONTRACTOR SHALL INCLUDE A DRAWING THAT SHOWS T |
|
| LOCATIONS WHERE THE ACTUAL MEASUREMENTS WERE TAKEN. |
|
| A DUCT STATIC PRESSURE READING SHALL BE TAKEN AT EACH LOCATION WHERE A DUC |
|
| TRAVERSE READING IS TAKEN AND SHALL BE INCLUDED IN THE FINAL POST- |
CONSTRUCT |
| TAB REPORT. |
|
| TAB CONTRACTOR SHALL COMPILE AND SUBMIT COPIES OF THE FINAL POST |
|
| CONSTRUCTION TAB REPORT AS REQUIRED BY SECTION 23 05 93. |
|
| HVAC SHEET INDEX |
|
| M000 |
HVAC COVERSHEET |
| M100 |
BASEMENT DEMOLITION PLAN - HVAC |
| M101 |
LEVEL 01 DEMOLITION PLAN - HVAC |
| M102 |
LEVEL 02 DEMOLITION PLAN - HVAC |
| M210 |
BASEMENT PLAN - VENTILATION |
| M211 |
LEVEL 01 PLAN - VENTILATION |
| M212 |
LEVEL 02 PLAN - VENTILATION |
| M400 |
HVAC DETAILS |
| M500 |
HVAC SCHEDULES |
| GRAND TOTAL: 9 |
|
VIEW KEY MECHANICAL RENOVATION NOTES: PIPING GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED 1. PIPE DRAIN LINES FROM EQUIPMENT TO NEAREST FLOOR DRAIN.
NAME LEVEL NAME 1 KEYNOTE: INDICATES NOTE USED TO TO VENTILATION & PIPING. 2. INSTALL ALL REFRIGERANT LIQUID AND SUCTION PIPING SIZED PER EQUIPMENT
10'-0" HEIGHT ABOVE DESCRIBE ADDITIONAL INFORMATION MANUFACTURER RECOMMENDATIONS.
PROJECT 0'-0" ABOUT WORK REQUIRED, SPECIFIC
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
TO THE SHEET AND/OR DETAIL
SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND VENTILATION GENERAL NOTES:
REPORT ANY CONFLICTS BEFORE PROCEEDING.
INDICATES DIRECTION OF TRUE NORTH 2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS 1. UNLESS NOTED OTHERWISE, DUCT SIZES SHOWN ON DRAWINGS ARE INSIDE CLEAR
BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK. DIMENSIONS. MAINTAIN CLEAR DIMENSIONS INSIDE ANY LINING
PLAN OR DETAIL NUMBER 3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE 2. PROVIDE ACCESS DOORS AT ALL DUCT MOUNTED EQUIPMENT.
PLAN OR DETAIL NAME FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD 3. EXISTING AIR INLET AND OUTLET CFM SHOWN ON DRAWINGS ARE FROM EXISTING
CONDITIONS. DRAWINGS, AND ARE FOR REFERENCE ONLY. CONTRACTOR SHALL USE PRE-BALANCE
VIEW NAME 4. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF VALUES, AND NOT EXISTING CFM SHOWN ON DRAWINGS.
WALLS AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS. 4. CONTRACTOR MAY REUSE PORTIONS OF EXISTING DUCT PROVIDED SIZES AND PRESSURE
1
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CLASSES ARE CORRECT, DUCT IS THOROUGHLY CLEANED AND FREE OF DEFECTS, AND ALL
1/8" = 1'-0" CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS ARE SEALED
N H PLAN OR DETAIL SCALE CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO AS SPECIFIED FOR NEW DUCTWORK.
O RT BIDDING.
6. WHERE EXISTING MECHANICAL SYSTEMS DIFFER FROM THOSE SHOWN ON THE PROJECT MECHANICAL GENERAL NOTES:
DRAWINGS AND CREATE CONFLICTS WITH NEW EQUIPMENT, PIPING, OR DUCTWORK
INDICATES SIMILAR DETAIL REFERENCED INSTALLATIONS, THE CONTRACTOR SHALL PROVIDE DETAILED DOCUMENTATION (SUCH AS
IN MULTIPLE LOCATIONS SKETCHES, PHOTOS, AND DIMENSIONS) ALONG WITH RECOMMENDATIONS TO RESOLVE THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
SIM SIM
THE CONFLICT. THIS INFORMATION MUST BE SUBMITTED TO THE ENGINEER FOR REVIEW TO VENTILATION, & PIPING.
DETAIL REFERRED TO BY SECTION CUT 1 AND APPROVAL. NO WORK RELATED TO THE CONFLICT SHALL PROCEED UNTIL AN
1 4 2
3 APPROVED RESOLUTION IS PROVIDED BY THE ENGINEER. 1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
M101 SHEET DETAIL IS LOCATED ON T101 7. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC., www.imegcorp.com
REMAIN ACTIVE. AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE 2882 106TH STREET
LINE TYPE AND TAG KEY: 8. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING DES MOINES, IA 50322
REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT. P: 515.334.9906 F: 515.334.9908
NEW WORK BY THIS CONTRACTOR (WIDE LINE) SYSTEMS ARE INSTALLED. 2. CATALOG AND MODEL NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN
NEW 9. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR AS AN AID TO THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR
EXISTING TO BE REMOVED (SHORT DASHED PATTERN) TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND IS RESPONSIBLE FOR THE COMPLETE DESCRIPTION OF MATERIAL SCHEDULED ON THESE
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN) CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY DRAWINGS AND IN THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE
DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE. MATERIAL AND SCHEDULED PERFORMANCE TAKES PRECEDENCE OVER THE MODEL
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE) 10. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT NUMBER. THE FIRST MANUFACTURER SCHEDULED IS THE BASIS OF DESIGN. PROFESSIONAL SEAL
EXISTING THAT HAS BEEN REMOVED. 3. DETERMINATION OF QUANTITIES OF MATERIAL AND EQUIPMENT REQUIRED SHALL BE MADE
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN) 11. PROPERLY RECLAIM AND DISPOSE OF ALL REFRIGERANT IN REMOVED EQUIPMENT/ BY THE CONTRACTOR FROM THE DOCUMENTS. WHERE MATERIAL AND/OR QUANTITY
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN) REFRIGERANT PIPING. RECLAIMED REFRIGERANT SHALL HAVE DOCUMENTATION AS DISCREPANCIES ARISE BETWEEN DRAWINGS, SCHEDULES AND/OR SPECIFICATIONS, THE
REQUIRED BY THE AUTHORITY HAVING JURISDICTION (AHJ). HIGHER QUALITY/ GREATER NUMBER SHALL GOVERN.
HALFTONING DOES NOT MODIFY SCOPE. 4. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
5. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
6. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS. CONSULTANT
7. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
FIRE / SMOKE BARRIER DESIGNATIONS COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO OTHERS.
FIRE AND SMOKE SEPARATIONS ARE NOT SHOWN ON THESE DOCUMENTS. CONTRACTOR SHALL 8. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
REVIEW THE ARCHITECTURAL PLANS AND DETERMINE THE LOCATIONS OF ALL FIRE AND SMOKE CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
PARTITIONS, BARRIERS, AND WALLS. THIS INCLUDES FLOOR RATINGS. PRICING SHALL INCLUDE DESIGN.
HVAC ABBREVIATION KEY
ALL MATERIALS AND LABOR REQUIRED TO MAINTAIN THE RATINGS OF ALL RATED SEPARATIONS, 9. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
WHETHER SHOWN ON THE ENGINEERING PLANS OR NOT. FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
ABBR: DESCRIPTION:
FINISH.
KEY PLAN
10. SEAL ALL FLOOR & WALL PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING, AND DUCTS
AFF ABOVE FINISHED FLOOR PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS SHALL BE SEALED AIRTIGHT WITH
WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER FOR OUTDOOR USE.
APPLICABLE CODES CO CLEANOUT
11. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
DN DOWN
OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS NIC NOT IN CONTRACT RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING: 12. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
SCCR SHORT CIRCUIT CURRENT RATING
BUILDING CODE: IBC 2024 EDITION MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
TYP TYPICAL
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
UON UNLESS OTHERWISE NOTED PIPING, DUCTWORK, ETC.
FIRE CODE: IFC 2024 EDITION 13. DO NOT BLOCK EQUIPMENT SERVICE CLEARANCES.
14. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3'-6"IN FRONT OF ALL ELECTRICAL
EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT
PLUMBING CODE: UPC 2021 EDITION LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS, AGENCY APPROVAL
TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.
15. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THEWIDTH / DEPTH
MECHANICAL CODE: IMC 2021 EDITION OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6'-0"ABOVE THE
EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO
THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICATED
ELECTRICAL CODE: NFPA 70 (NEC) 2023 EDITION ELECTRICAL SPACE INCLUDING: DUCTWORK, PIPING, ETC.
TAB PRE-DEMOLITION NOTES:
ENERGY CONSERVATION CODE: IECC 2012
1. BEFORE ANY DEMOLITION WORK IS BEGUN, AN AIR BALANCE TEST SHALL BE PERFORMED
LOCAL BUILDING CODE: CURRENT EDITION CONTACT PERSONS: BY THE TESTING, ADJUSTING AND BALANCING (TAB) CONTRACTOR FOR EQUIPMENT AND
DEVICES AS INDICATED ON THE DRAWINGS.
2. PROVIDE DUCT TRAVERSE READINGS AT LOCATIONS DESIGNATED ON THE DRAWINGS.
DESCRIPTION: PERSON: A. IN THE EVENT A DUCT TRAVERSE LOCATION AS MARKED ON THIS PLAN IS DISCLAIMER
INACCESSIBLE FOR MEASUREMENT, THE TAB CONTRACTOR SHALL PERFORM THE
IMEG RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO
PROJECT MANAGER NATE JACQUES TRAVERSE AT AN ALTERNATE LOCATION OR SHALL TAKE MULTIPLE DUCT THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING
CONTRACTOR ABBREVIATION KEY TRAVERSES AND/OR READINGS AS REQUIRED TO DETERMINE THE AIRFLOW AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG AND SHALL NOT
BE USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE
MECHANICAL EVAN HAMMER READING WHERE THE DUCT TRAVERSE SYMBOL IS SHOWN. IN THE EVENT EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF IMEG.
TRAVERSES ARE TAKEN AT ALTERNATE LOCATION(S), TAB CONTRACTOR SHALL (C)2026 IMEG CONSULTANTS CORP.
ABBR: DESCRIPTION:
ELECTRICAL TONY DELOUIS INCLUDE A DRAWING THAT SHOWS THE LOCATIONS WHERE THE ACTUAL
0 1 2 3
MEASUREMENTS WERE TAKEN.
A.C. ASBESTOS ABATEMENT CONTRACTOR B. TAKE A DUCT STATIC PRESSURE READING AT EACH LOCATION WHERE A DUCT REF. SCALE IN INCHES PROJECT #26001283.00
TRAVERSE READING IS TAKEN AND INCLUDE IN THE FINAL PRE-DEMOLITION TAB
A.V.C. AUDIO/VISUAL CONTRACTOR
REPORT. REVISIONS
C.C. CIVIL CONTRACTOR 3. TAB CONTRACTOR SHALL COMPILE AND SUBMIT THE FINAL PRE-DEMOLITION REPORT
No. Date Revision / Issue WITHIN 10 WORKING DAYS AFTER THE FIELD MEASUREMENTS ARE COMPLETED. FINAL TAB
C.M. CONSTRUCTION MANAGER
REPORT SHALL BE SUBMITTED FOR REVIEW TO THE ARCHITECT/ENGINEER. TESTING SHALL
E.C. ELECTRICAL CONTRACTOR INCLUDE ALL ITEMS REQUIRED IN THE SPECIFICATIONS.
F.P.C. FIRE PROTECTION CONTRACTOR
TAB POST-CONSTRUCTION NOTES:
F.S.C. FOOD SERVICE CONTRACTOR
G.C. GENERAL CONTRACTOR 1. AFTER CONSTRUCTION ACTIVITIES ARE COMPLETE, TESTING, ADJUSTING (TAB) AND
BALANCING CONTRACTOR SHALL REBALANCE AIR HANDLING UNITS AS REQUIRED TO
H.C. HEATING CONTRACTOR ACHIEVE THE NEW AIRFLOW VALUES SHOWN ON THE CONSTRUCTION DRAWINGS.
2. AREAS SERVED BY THIS EQUIPMENT WHICH WERE NOT RENOVATED SHALL BE RE-
M.C. MECHANICAL CONTRACTOR
BALANCED TO THE AIRFLOW RATES MEASURED BEFORE THE RENOVATION OCCURRED
N.C.C. NURSE CALL CONTRACTOR (REFER TO THE FINAL PRE-DEMOLITION REPORT).
3. IF DUCT TRAVERSE LOCATION AS MARKED ON THE DRAWINGS IS INACCESSIBLE FOR
P.C. PLUMBING CONTRACTOR
MEASUREMENT, THE TAB CONTRACTOR SHALL PERFORM THE TRAVERSE AT AN ALTERNATE
LOCATION OR SHALL TAKE MULTIPLE DUCT TRAVERSES AND/OR GRILLE READINGS AS
S.C. SECURITY CONTRACTOR
REQUIRED TO DETERMINE THE FLOW RATE. IN THE EVENT TRAVERSES ARE TAKEN AT AN
T.C. TECHNOLOGY CONTRACTOR ALTERNATE LOCATION(S), TAB CONTRACTOR SHALL INCLUDE A DRAWING THAT SHOWS THE
SHEET INFORMATION
LOCATIONS WHERE THE ACTUAL MEASUREMENTS WERE TAKEN.
T.C.C. TEMPERATURE CONTROLS CONTRACTOR
4. A DUCT STATIC PRESSURE READING SHALL BE TAKEN AT EACH LOCATION WHERE A DUCT
Issue
TRAVERSE READING IS TAKEN AND SHALL BE INCLUDED IN THE FINAL POST-CONSTRUCTION
V.C. VENTILATION CONTRACTOR
TAB REPORT. Date
5. TAB CONTRACTOR SHALL COMPILE AND SUBMIT COPIES OF THE FINAL POST-
CONSTRUCTION TAB REPORT AS REQUIRED BY SECTION 23 05 93. Project #
6. THE FINAL POST CONSTRUCTION REPORT SHALL INCLUDE ALL ITEMS REQUIRED IN THE
Drawn
SPECIFICATIONS.
Checked
Approved
SHEET TITLE
SCALE
Scale: As indicated
SHEET NUMBER
MP
22:70:01
6202/72/4
IDAS 9501.00 DOC NCCF
AIR HANDLER
REPLACEMENT
313 LANEDALE
ROCKWELL CITY, IOWA 50579
Iowa Department of
Administratinve Services
100% CD
4/29/2026
26001283.00
EJH
NKJ
NKJ
HVAC COVERSHEET
M000
TNEMECALPER
RELDNAH
RIA
FCCN
COD
00.1059
SADI
00.38210062
SYMBOL LIST - PIPING SYSTEMS
SYMBOL DESCRIPTION o F FLUID TYPE
DPP DRAIN - PIPING
04/29/2026
HWR HEATING WATER RETURN 150 Water
HWS HEATING WATER SUPPLY 180 Water
LIQ REFRIGERANT LIQUID 120 Water
SUC REFRIGERANT SUCTION 35 Water
DUCT ABBREVIATION KEY
ABBR. DESCRIPTION
EA EXHAUST AIR
OA OUTSIDE AIR
SA SUPPLY AIR
HVAC SHEET INDEX
M000 HVAC COVERSHEET
M100 BASEMENT DEMOLITION PLAN - HVAC
M101 LEVEL 01 DEMOLITION PLAN - HVAC
M102 LEVEL 02 DEMOLITION PLAN - HVAC
M210 BASEMENT PLAN - VENTILATION
M211 LEVEL 01 PLAN - VENTILATION
M212 LEVEL 02 PLAN - VENTILATION
M400 HVAC DETAILS
M500 HVAC SCHEDULES
GRAND TOTAL: 9
| KEYNOTES:
1. CONDENSING UNIT IS INSTALLED ON GRADE
ON PAD OUTSIDE OF BUILDING.
REMOVE, SALVAGE, &
PROTECT EXISTING FAN COIL &
TURN OVER TO OWNER.
REMOVE ASSOCIATED
REFRIGERANT PIPING & PIPING
HANGERS. EXISTING AHU
HANGERS TO REMAIN.
UA2
27
UA2
26
1/2"DPP
SG-E
12x6/200
(TYP.)
AS
BEFORE ANY DEMOLITION WORK IS AS RECOMMENDED
FCU-2-E BEGUN, AN AIR BALANCE TEST SHALL BE 6x21 6x41 DUCT TRAVERSE
PERFORMED BY THE TESTING, LOCATION
ADJUSTING AND BALANCING (TAB)
CONTRACTOR.
SC-E EXISTING STEAM COIL
TO REMAIN
UA2
11
UA2
25
REMOVE, SALVAGE, & PROTECT
EXISTING CONDENSING UNIT & TURN
CU-2-E
OVER TO OWNER
UA2
12 1
EG-E
8/150
8x8 EA
UA2 AS AS
22 21x42 21x42 1 REMOVE EXISTING
12x6 EA
CONDENSING UNIT
EF-2 (E) UA2
13 CU-3-E
EG-E
8/150
T
REMOVE EXISTING
THERMOSTAT AND CONTROL
WIRING. EXISTING CONDUITS
TO REMAIN.
AS AS
21x02 21x02
UA2
UA2 02
21
UA2
19
UA2
14
UA2
15
UA2 AS AS
05
21x41 21x41
UA2
16
UA2
17
UA2
20
LEVEL 01 DEMOLITION PLAN - UNIT A - HVAC
1
1/4" = 1'-0"
N H
OR T |
|
| IDAS 9501.00 DOC NCCF |
| AIR HANDLER |
| REPLACEMENT |
| CONDENSING UNIT IS INSTALLED ON GRADE |
| ON PAD OUTSIDE OF BUILDING. |
| REMOVE, SALVAGE, & |
|
|
| PROTECT EXISTING FAN COIL & |
|
|
|
|
|
| TURN OVER TO OWNER. |
|
|
|
|
|
| REM
REF |
OV
RIG |
|
| HAN |
GER |
S. EXISTING AHU |
| HAN |
GER |
S TO REMAIN. |
| 313 LANEDALE |
| ROCKWELL CITY, IOWA 50579 |
| PERFORMED BY TH |
E TESTING, |
| ADJUSTING AND BA |
LANCING (TAB) |
T
REMOVE, SALVAGE, &
PROTECT EXISTING FAN COIL &
TURN OVER TO OWNER.
REMOVE ASSOCIATED
REFRIGERANT PIPING & PIPING
HANGERS. EXISTING AHU
HANGERS TO REMAIN.
UA2
27
UA2
26
BEFORE ANY DEMOLITION WORK IS
FCU-2-E BEGUN, AN AIR BALANCE TEST SHALL BE
PERFORMED BY THE TESTING,
ADJUSTING AND BALANCING (TAB)
CONTRACTOR.
UA2
11
UA2
25
UA2
12
EG-E
8/150
8x8 EA
UA2
22
12x6 EA
EF-2 (E) UA2
13
EG-E
8/150
UA2
UA2 02
21
UA2
19
UA2
14
UA2
15
UA2
05
UA2
16
UA2
17
UA2
20
AS
21x41
AS
21x42
AS
21x02
AS
21x42
AS
21x02
AS
21x41
SG-E
12x6/200
(TYP.)
CU-2-E
AS
6x21
AS
6x41
1/2"DPP
RECOMMENDED
DUCT TRAVERSE
LOCATION
www.imegcorp.com
2882 106TH STREET
DES MOINES, IA 50322
SC-E EXISTING STEAM COIL P: 515.334.9906 F: 515.334.9908
TO REMAIN
REMOVE, SALVAGE, & PROTECT
EXISTING CONDENSING UNIT & TURN
OVER TO OWNER PROFESSIONAL SEAL
1
1 REMOVE EXISTING
CONDENSING UNIT
CU-3-E
CONSULTANT
REMOVE EXISTING
THERMOSTAT AND CONTROL
WIRING. EXISTING CONDUITS
TO REMAIN.
KEY PLAN
AGENCY APPROVAL
DISCLAIMER
IMEG RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO
THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING
AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG AND SHALL NOT
BE USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE
EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF IMEG.
(C)2026 IMEG CONSULTANTS CORP.
0 1 2 3
REF. SCALE IN INCHES PROJECT #26001283.00
REVISIONS
No. Date Revision / Issue
SHEET INFORMATION
Issue
Date
Project #
Drawn
Checked
Approved
SHEET TITLE
SCALE
Scale: 1/4" = 1'-0"
SHEET NUMBER
MP
42:70:01
6202/72/4
IDAS 9501.00 DOC NCCF
AIR HANDLER
REPLACEMENT
313 LANEDALE
ROCKWELL CITY, IOWA 50579
Iowa Department of
Administratinve Services
100% CD
4/29/2026
26001283.00
EJH
NKJ
NKJ
LEVEL 01 DEMOLITION PLAN - HVAC
M101
TNEMECALPER
RELDNAH
RIA
FCCN
COD
00.1059
SADI
00.38210062
KEYNOTES:
1. CONDENSING UNIT IS INSTALLED ON GRADE
ON PAD OUTSIDE OF BUILDING.
04/29/2026
LEVEL 01 DEMOLITION PLAN - UNIT A - HVAC
1
1/4" = 1'-0"
N H
OR T
| TO CU-1-E MOD-E
EXISTING STEAM COIL TO REMAIN SC-E CONDENSING KEYNOTES:
1/2"LIQ 1
UNIT IS INSTALLED
1/2"DPP
1/2"LIQ ON GRADE ON 1. RETURN AND OA DAMPERS ARE TO REMAIN.
1/2"SUC
1/2"SUC PAD OUTSIDE OF
RECOMMENDED BUILDING
DUCT TRAVERSE
LOCATION
MOD-E
CU-1-E FCU-1 (E)
EXISTING LOUVER
1
SG-E
12x6/200
(TYP.)
1/2"DPP
REMOVE EXISTING FAN COIL,
1 1/2"HWR
CONDENSING UNIT, AND 1 1/2"HWR EXISTING LOUVER
2 1/2"HWS
ASSOCIATED REFRIGERANT
2 1/2"HWS PIPING, AND PIPING REMOVE EXISTING FAN COIL,
HANGERS. EXISTING AHU CONDENSING UNIT, AND
SG-E HANGERS TO REMAIN. FCU-3-E ASSOCIATED REFRIGERANT
12x6/200 1/2"SUC PIPING, AND PIPING
(TYP.) REMOVE EXISTING 1/2"SUC HANGERS. EXISTING AHU
THERMOSTAT AND CONTROL HANGERS TO REMAIN
WIRING. EXISTING
T
CONDUITS TO REMAIN.
RECOMMENDED
DUCT TRAVERSE SC-E
LOCATION
EXISTING STEAM BEFORE ANY DEMOLITION WORK IS AS AS
COIL TO REMAIN BEGUN, AN AIR BALANCE TEST SHALL BE 21x42 21x42
PERFORMED BY THE TESTING,
ADJUSTING AND BALANCING (TAB)
CONTRACTOR.
AS AS
21x42 21x42
AS AS
21x02 21x02
AS AS
21x02 21x02
REMOVE EXISTING
THERMOSTAT AND CONTROL
WIRING. EXISTING
CONDUITS TO REMAIN.
T
AS AS
21x41 21x41
AS
AS
21x41
21x41
EG-E
8/150
12x6 EA
12x12 EA UP
12x6 EA EG-E
8/150
LEVEL 02 DEMOLITION PLAN - UNIT A - HVAC LEVEL 02 DEMOLITION PLAN - UNIT B - HVAC
1 2
1/4" = 1'-0" 1/4" = 1'-0"
N H N H
O T O T
R R |
|
|
|
|
1/2"LIQ |
|
|
|
|
|
|
|
1/2"DPP |
|
|
|
|
|
|
|
|
|
|
|
|
|
1 1/2"HWR
2 1/2"HWS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| RECOMMENDE
DUCT TRAVERS |
| LOCATION |
|
O |
|
| BEGUN, AN AIR BA |
L |
ANCE TEST SHALL BE |
| PERFORMED BY TH |
|
|
|
A |
|
|
|
|
| THERMOSTAT AND CONTRO |
| WIRING. EXISTING |
T
T
EXISTING LOUVER
SG-E 12x6/200
(TYP.)
EXISTING STEAM
COIL TO REMAIN
AS
21x41
AS
21x42
AS
21x02
AS
21x42
AS
21x02
AS
21x41
1/2"LIQ
1/2"LIQ
1/2"SUC 1/2"SUC
MOD-E
CU-1-E
1
1/2"DPP
REMOVE EXISTING FAN COIL,
1 1/2"HWR
CONDENSING UNIT, AND 1 1/2"HWR EXISTING LOUVER
2 1/2"HWS
ASSOCIATED REFRIGERANT
2 1/2"HWS PIPING, AND PIPING
HANGERS. EXISTING AHU
HANGERS TO REMAIN. FCU-3-E 1/2"SUC
REMOVE EXISTING 1/2"SUC
THERMOSTAT AND CONTROL
WIRING. EXISTING
CONDUITS TO REMAIN.
RECOMMENDED
DUCT TRAVERSE SC-E
LOCATION
BEFORE ANY DEMOLITION WORK IS
BEGUN, AN AIR BALANCE TEST SHALL BE
PERFORMED BY THE TESTING,
ADJUSTING AND BALANCING (TAB)
CONTRACTOR.
AS
21x41
AS
21x42
AS
21x02
AS
21x42
AS
21x02
AS
21x41
TO CU-1-E MOD-E
EXISTING STEAM COIL TO REMAIN SC-E CONDENSING 1
UNIT IS INSTALLED
1/2"DPP
ON GRADE ON
PAD OUTSIDE OF
RECOMMENDED BUILDING
DUCT TRAVERSE
LOCATION
FCU-1 (E)
SG-E
12x6/200
(TYP.)
REMOVE EXISTING FAN COIL,
CONDENSING UNIT, AND
ASSOCIATED REFRIGERANT PIPING, AND PIPING
HANGERS. EXISTING AHU
HANGERS TO REMAIN
www.imegcorp.com
2882 106TH STREET
DES MOINES, IA 50322
P: 515.334.9906 F: 515.334.9908
PROFESSIONAL SEAL
CONSULTANT
KEY PLAN
AGENCY APPROVAL
REMOVE EXISTING
THERMOSTAT AND CONTROL
WIRING. EXISTING
CONDUITS TO REMAIN.
DISCLAIMER
IMEG RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO
THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING
AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG AND SHALL NOT
BE USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE
EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF IMEG.
(C)2026 IMEG CONSULTANTS CORP.
0 1 2 3
REF. SCALE IN INCHES PROJECT #26001283.00
REVISIONS
No. Date Revision / Issue
EG-E
8/150
12x6 EA
SHEET INFORMATION
12x12 EA UP
Issue
Date
Project #
Drawn
12x6 EA EG-E
8/150 Checked
Approved
SHEET TITLE
SCALE
Scale: 1/4" = 1'-0"
SHEET NUMBER
MP
52:70:01
6202/72/4
IDAS 9501.00 DOC NCCF
AIR HANDLER
REPLACEMENT
313 LANEDALE
ROCKWELL CITY, IOWA 50579
Iowa Department of
Administratinve Services
100% CD
4/29/2026
26001283.00
EJH
NKJ
NKJ
LEVEL 02 DEMOLITION PLAN - HVAC
M102
TNEMECALPER
RELDNAH
RIA
FCCN
COD
00.1059
SADI
00.38210062
KEYNOTES:
1. RETURN AND OA DAMPERS ARE TO REMAIN.
04/29/2026
LEVEL 02 DEMOLITION PLAN - UNIT A - HVAC LEVEL 02 DEMOLITION PLAN - UNIT B - HVAC
1 2
1/4" = 1'-0" 1/4" = 1'-0"
N H N H
O T O T
R R