Bid No. 27-02 Fairgrove TK/K Building & Campuswide Fire Alarm; Project No. 5120 (2 OF 2) Addendum No. 2

Location: California
Posted: Sep 16, 2026
Due: Sep 22, 2026
Agency: Lucia Mar Unified School District
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
  • Bid No. 27-02 Fairgrove TK/K Building & Campuswide Fire Alarm; Project No. 5120 (2 OF 2)
  • Attachment Preview

    TEST MARK (For DSA Use Only) Prior to adding document to
    the Session the Plan Reviewer shall place this test mark off the
    top edge of the first sheet and change status to
    "INCORPORATE". If Back-check menu does not show or the
    color does not change to green, the Plan Reviewer shall fix the
    back-check menu. For guidance on how to fix the back-check
    menu, refer to "_DSA EPR Support > Help Desk > Fixing Back
    Check Menu"
    FAIRGROVE
    ELEMENTARY SCHOOL
    FIRE ALARM SERVICE UPGRADE
    GROVER BEACH, CALIFORNIA
    LUCIA MAR UNIFIED
    SCHOOL DISTRICT
    PROJECT MANUAL
    DSA SUBMITTAL
    MAY 2025
    BID SET 01 _ AUGUST 6TH 2026 _ NOT FINAL ISSUANCE FOR CONSTRUCTION

    C-22474
    REEN. 10-31-227
    4

    Lucia Mar Unified School District 19six Project No. 23039.01
    Fairgrove Elementary School DSA #: 03-124876
    FA Service Replacement
    Project Specification
    PROJECT PROFESSIONAL STAMPS
    PPRROOJJEECCTT PPRROOFFEESSSSIIOONNAALL SSTTAAMMPPSS
    LL II CC L EE A A NN N N SS G G EE L L DD E E N N AA K RR K R C R C O O HH E E I K K I TT E EE CC TT
    __________________________________________________________________________________ AL ER
    A R
    AAlalann GGlelenn KKrrooeekkeerr C C--2222447744 C-22474
    1199ssixix AArrcchhititeeccttss
    C-22474
    5
    S
    5
    S a
    6
    a
    6
    n
    0
    n
    0
    L
    H
    L
    H
    u
    i
    u
    gi
    i
    g
    si
    u
    s
    u
    O
    e
    O
    er
    b
    ra
    b
    a
    i si
    S
    sp
    S
    p
    tt
    o
    r
    o
    re
    ,
    e
    ,
    e
    C
    e
    C
    t
    A
    t,
    A
    , S S
    9
    u
    9
    u
    3
    i
    3
    ti
    4
    t
    4
    e
    0
    e
    0
    C
    1
    C
    1
    SS TT
    AA TT EE
    RRE
    O N
    E
    O
    N
    . FF 1
    . 1
    0 C
    0
    C
    -
    A
    3
    A 3 L
    1
    1 L
    -
    I
    2
    FI
    2
    F
    7
    O
    5
    ORR
    NNI A I A
    _________________________________________ R E EY M. E
    T Jeffrey M. Thoma No. 20823
    S Thoma Electric, Inc. GI
    E
    3562 Empleo Street NO. 20823
    San Luis Obispo, CA 93401
    E
    S T A
    T
    L EC
    E
    OF
    END OF SECTION 00 00 01 EXPIRES: 09/30/26
    THOMA #25-8020
    SIGNATURES
    R
    D
    PROFESSIONA
    L
    T E F R H N G
    E F O M I N
    J A E E
    R
    L
    TRI C A NI A
    CALIFOR
    IDENTIFICATION STAMP
    DIV. OF THE STATE ARCHITECT
    DDDDSSSSAAAA
    APP:03-124876 INC:
    REVIEWED FOR
    SS 4 DDDDFIIIIVVVVLIIIISSSSSIIIIOOOONNNN OOOO4FFFF TTTTHHHHEEEE SSSSTTTTAAAAATTTTEEEEC AAAARRRRSCCCCHHHHIIIITTTTEEEECCCCTTTT
    DEPARTMENT OF GENERAL SERVICES
    DATE: 04/22/2026
    BID SET 01 _ AUGUST 6TH 2026 _ NOT FINAL ISSUANCE FOR CONSTRUCTION

    Lucia Mar Unified School District 19six Project No. 23039.01
    Fairgrove Elementary School DSA #: 03-124876
    FA Service Replacement
    Project Specification
    SECTION 00 00 01
    TABLE OF CONTENTS
    DIVISION 1 - GENERAL REQUIREMENTS
    01 10 00 Summary 19six
    01 25 00 Contract Modification Procedures 19six
    01 29 00 Payment Procedures 19six
    01 30 00 Request for Information Form 19six
    01 31 00 Project Management and Coordination 19six
    01 32 00 Construction Progress Documentation 19six
    01 33 00 Submittal Procedures 19six
    01 40 00 Testing and Inspections 19six
    01 44 00 Quality Requirements 19six
    01 50 00 Temporary Facilities and Controls 19six
    01 60 00 Product Requirements 19six
    01 60 01 Product List Form 19six
    01 60 02 Similar Installation List Form 19six
    01 60 03 Substitution Request Form 19six
    01 70 00 Execution Requirements 19six
    01 73 00 Cutting and Patching 19six
    01 73 02 Selective Demolition Procedures 19six
    01 73 50 Alteration Procedures 19six
    01 77 00 Closeout Procedures 19six
    01 78 40 Project As-Built Documents 19six
    DIVISION 26 - ELECTRICAL
    26 05 00 Common Work Results for Electrical THOMA
    26 05 01 Selective Electrical Demolition THOMA
    TABLE OF CONTENTS 00 00 01 - 1
    BID SET 01 _ AUGUST 6TH 2026 _ NOT FINAL ISSUANCE FOR CONSTRUCTION

    Lucia Mar Unified School District 19six Project No. 23039.01
    Fairgrove Elementary School DSA #: 03-124876
    FA Service Replacement
    Project Specification
    26 05 19 Low Voltage Electrical Power Conductors and Cables THOMA
    26 05 26 Grounding and Bonding for Electrical Systems THOMA
    26 05 29 Hangers and Supports THOMA
    26 05 33 Raceways and Boxes for Electrical Systems THOMA
    DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
    28 31 00 Fire Alarm and Detection System THOMA
    TABLE OF CONTENTS 00 00 01 - 2
    BID SET 01 _ AUGUST 6TH 2026 _ NOT FINAL ISSUANCE FOR CONSTRUCTION

    Lucia Mar Unified School District 19six Project No. 23039.01
    Fairgrove Elementary School DSA #: 03-124876
    FA Service Replacement
    Project Specification
    SECTION 01 10 00
    Project Summary
    GENERAL
    RELATED DOCUMENTS
    Drawings and general provisions of the Contract, including General and Supplementary
    Conditions and other Division 1 Specification Sections, apply to this Section.
    SUMMARY
    This Section includes the following:
    Work covered by the Contract Documents.
    Type of the Contract.
    Work phases.
    Use of premises.
    Owner's occupancy requirements.
    Work restrictions.
    Specification formats and conventions.
    Pollution control.
    WORK COVERED BY CONTRACT DOCUMENTS
    Project Identification: DSA # 03-124876
    Architects Project # 23039.01
    Project Location: 2101 The Pike., Grover Beach, CA 93433
    Owner: Lucia Mar Unified School District
    Architect: 19six Architects
    The Work consists of the following:
    Fire Alarm service upgrade.
    TYPE OF CONTRACT
    Project will be constructed under a single-prime Bid Build contract.
    WORK PHASES
    The Work shall be conducted in single phase.
    Schedule Milestones:
    School District shall furnish milestones.
    CONTRACTOR DUTIES
    Provide and pay for:
    Labor, material and equipment.
    Tools, construction equipment and machinery.
    Telephone, fax, computer and communication services. See Section 01 50 00 - Temporary
    Facilities and Controls.
    a. Telephone: Do not connect to the District telephone system.
    PROJECT SUMMARY 01 10 00 - 1
    BID SET 01 _ AUGUST 6TH 2026 _ NOT FINAL ISSUANCE FOR CONSTRUCTION

    Lucia Mar Unified School District 19six Project No. 23039.01
    Fairgrove Elementary School DSA #: 03-124876
    FA Service Replacement
    Project Specification
    b. Make connections and provide labor, materials and equipment for site distribution
    of Contractor's phone and communication services.
    Water and Utilities: See Specification Section 01 50 00 - Temporary Facilities and Controls.
    a. Make connections and provide labor, materials and equipment for site distribution
    of temporary utilities from the Campus' point of connection.
    b. Remove temporary utilities from the site when the work is completed.
    c. Exception: District pays for water and electricity for construction.
    Other facilities and services necessary for proper execution and completion of Work.
    Pay legally required sales, consumer and use taxes.
    Secure and pay for all site-specific costs, as necessary for proper execution and completion of
    Work, and as applicable at time of receipt of bids.
    Licenses
    Permits and Fees
    Governmental Fees
    Royalties
    Give required notices.
    Comply with codes, ordinances, rules, regulations, orders and other legal requirements of public
    authorities, which bear on performance of Work.
    The Contractor shall certify in writing that no materials containing Asbestos are
    incorporated in the work, in accordance with the Asbestos Hazard Emergency Regulations
    Act.
    Promptly submit written notice to District Representative of observed variance of Contract
    Documents from legal requirements.
    District Representative will prepare modifications to Contract Documents for required
    changes.
    If Contractor observes work known to be contrary to requirements, and does not notify the
    District Representative, then Contractor assumes responsibility for work not meeting the
    requirements.
    Enforce strict discipline and good order among employees. Do not employ on Work:
    a. Unfit persons.
    b. Persons not skilled in assigned task.
    Comply with LMUSD Sexual Harassment Policy.
    Advise all sub-contractors in writing and post policy in prominent place.
    USE OF PREMISES
    General: Contractor shall have limited use of premises for construction operations as indicated
    on Drawings by the Contract limits.
    The Contractor shall always conduct the work so as to impose no hardship on the public,
    students, District or others engaged in District work nor cause any unreasonable delay or
    hindrance thereto. Construction activities must be scheduled to minimize disruption to the
    District and to District users.
    PROJECT SUMMARY 01 10 00 - 2
    BID SET 01 _ AUGUST 6TH 2026 _ NOT FINAL ISSUANCE FOR CONSTRUCTION

    Lucia Mar Unified School District 19six Project No. 23039.01
    Fairgrove Elementary School DSA #: 03-124876
    FA Service Replacement
    Project Specification
    The Contractor may not interrupt any District utilities without prior written permission from
    the District.
    Utility shutdowns must be scheduled with a minimum of seven (7) days advanced written
    notice.
    Confine operations at sites to areas permitted by:
    a. Laws
    b. Ordinances
    c. Permits
    d. Contract Documents
    Do not unreasonably encumber site with materials or equipment.
    Do not load structure with weight that will endanger structure.
    Assume full responsibility for protection and safekeeping of Contractor's and District's
    material stored on premises, and keep the site and building secure at all times.
    Obtain and pay for use of additional storage or Work areas that may be required for
    operations.
    Limit use of site for Contract Work and storage.
    Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of Project
    site beyond areas in which the Work is indicated.
    Owner Occupancy: Allow for Owner occupancy of Project site and use by the public.
    Driveways and Entrances: Keep driveways, loading areas, and entrances serving premises
    clear and available to Owner, Owner's employees, and emergency vehicles at all times.
    Do not use these areas for parking or storage of materials.
    a. Schedule deliveries to minimize space and time requirements for storage of
    materials and equipment on-site.
    SPECIAL DISTRICT REQUIREMENTS AND/OR CONTROLS
    Parking
    The Contractor, its employees, subcontractors, and material suppliers shall observe all
    District traffic and parking regulations.
    Park vehicles only in areas designated by the Contract Documents.
    Issuance of District Keys: Keys to work areas, if required, must be obtained from the District
    Representative. The Contractor or an authorized representative shall sign for receipt of keys. Upon
    completion of the work, all keys shall be returned to the District Representative. If the Contractor
    fails to return all keys issued, the Contractor shall be liable for the total cost of labor and materials
    to re-key all areas accessible with the lost keys. Final payment will not be authorized until all keys
    have been accounted for.
    Preservation: All existing buildings, slabs, walks, paving, landscaping and other improvements
    which are to remain, either adjacent to new construction or elsewhere on the campus, shall be
    protected from damage or defacement. Any damage or defacement caused by the Contractor shall
    be repaired or replaced to the satisfaction of the District at the Contractor's expense. Concrete
    walks shall be cut back to the nearest score line. Repairs to damaged asphalt paving shall be made
    with hot asphalt. Repairs to all other damaged surfaces shall be made with in kind material to a
    like new condition regardless of its existing condition.
    PROJECT SUMMARY 01 10 00 - 3
    BID SET 01 _ AUGUST 6TH 2026 _ NOT FINAL ISSUANCE FOR CONSTRUCTION

    Lucia Mar Unified School District 19six Project No. 23039.01
    Fairgrove Elementary School DSA #: 03-124876
    FA Service Replacement
    Project Specification
    Protection
    The Contractor shall protect concrete from vandalism. Graffiti shall not be allowed in the
    finished product. Contractor shall replace vandalized areas at no cost to the District.
    Repairs shall be from control joint to control joint, and doweled to existing concrete.
    Landscape areas used for set-up shall be restored to their prior condition including leveling,
    repairing irrigation and reseeding.
    Salvage: The District shall have first rights of salvage for all items unless otherwise designated. All
    salvage items removed in connection with this work are to remain the property of the District and
    shall be delivered to the campus location designated by the District Representative. If the District
    waives salvage rights for an item, the item becomes the property and responsibility of the
    Contractor.
    Recycling
    Recycle waste material when possible and reasonable including construction materials,
    such as removed concrete and packaging material such as cardboard boxes.
    The Contractor shall cooperate with District efforts to track and report recycled materials,
    regardless of who does the recycling.
    See Contract Special Conditions.
    Procedures: Separate recyclable waste from other waste materials, trash, and debris.
    Separate recyclable waste by type at Project site to the maximum extent practical.
    a. Provide appropriately marked containers or bins for controlling recyclable waste
    until they are removed from Project site. Include list of acceptable and unacceptable
    materials at each container and bin.
    b. Inspect containers and bins for contamination and remove contaminated materials
    if found.
    c. Stockpile processed materials on-site without intermixing with other materials.
    Place, grade, and shape stockpiles to drain surface water. Cover to prevent
    windblown dust.
    d. Stockpile materials away from construction area. Do not store within drip line of
    remaining trees.
    e. Store components off the ground and protect from the weather.
    f. Remove recyclable waste off Owner's property and transport to recycling receiver or
    processor.
    Contract Work Limits: Unless noted on the drawings, the contract work limits shall include the areas
    affected by this project only.
    Existing District Utilities
    Utility Shut-downs: Contractor shall notify the District at least seven (7) days in advance of
    any intended interruption of utility services due to this work. All required interruptions
    shall be a part of the Contractor's construction schedule. Times and dates for such
    interruptions shall be solely at the discretion of the District and may be on a Saturday,
    Sunday, holiday, during quarter break, or after normal working hours and beyond three
    weeks after notification.
    Underground Utilities: Identification and locating of known underground utilities is the
    sole responsibility of the Contractor. The District shall provide access to all known
    PROJECT SUMMARY 01 10 00 - 4
    BID SET 01 _ AUGUST 6TH 2026 _ NOT FINAL ISSUANCE FOR CONSTRUCTION

    Lucia Mar Unified School District 19six Project No. 23039.01
    Fairgrove Elementary School DSA #: 03-124876
    FA Service Replacement
    Project Specification
    documentation. Contact Facilities Planning for existing utility atlas. Undocumented utilities
    identified in the field by the District as abandoned shall be removed by the Contractor at
    no additional cost if the utility interferes with the work.
    Traffic: All traffic laws are to be observed at all times by all vehicles. Temporary traffic control and
    temporary traffic signs required for the work shall follow governing body regulations. The closure
    of any road, parking lot or building access will require District approval. The Contractor shall submit
    a written request for any proposed road closures using the District's standard request form a
    minimum of 21 days prior to the proposed closure date. Times and dates for such road closure shall
    be solely at the discretion of the District. Once approved, the Contractor shall post proper sign(s)
    in proper and approved location(s) a minimum of 48 hours prior to closure. The signs will be a
    minimum of 18" x 24" with lettering a minimum of 2" high and made of weatherproof material. All
    such closures shall be a part of the Contractor's construction schedule. All road and building
    driveway accesses require a minimum width of 12' for one-way traffic and 20' for two-way traffic at
    all times to allow for emergency vehicles, unless complete closure has been approved by the
    District. All large equipment working in and around pedestrian areas will require a spotter when
    backing up. Drivers of the equipment or back-up alarms are not considered "spotters". Large
    equipment includes, but is not limited to, backhoes, dump trucks, concrete trucks and delivery
    trucks.
    Holidays, Quarter Breaks, Weekends: Prior to start of construction, the District will provide the
    Contractor with a District calendar showing all study and examination periods, holidays and quarter
    breaks. Disruptive work will be discouraged during these times. Work by the Contractor will not be
    allowed during commencement, open house and other similar District events. The Contractor shall
    cooperate fully with any and all other subcontractors working on site to install District provided
    Furnishings, Fixtures and Equipment (FF&E).
    The Contractor will be provided with a list of FF&E and will be required to incorporate the FF&E
    into the schedule and coordinate the installation of these items with the District and the District's
    subcontractor. The installation of the FF&E will not delay the basic scope of work and may not have
    the same completion date. Subcontractors under separate contract with the District may use the
    Contractors basic utilities, i.e. portable toilets, power and water.
    OWNER'S OCCUPANCY REQUIREMENTS
    Full Owner Occupancy: Owner will occupy site and adjacent building during entire construction
    period. Cooperate with Owner during construction operations to minimize conflicts and facilitate
    Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations.
    Maintain existing exits, unless otherwise indicated.
    Maintain access to existing walkways, corridors, and other adjacent occupied or used
    facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities
    without written permission from Owner and authorities having jurisdiction.
    Provide not less than 72 hours' notice to Owner of activities that will affect Owner's
    operations.
    Owner Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to
    place and install equipment in completed areas of building, before Substantial Completion,
    PROJECT SUMMARY 01 10 00 - 5
    BID SET 01 _ AUGUST 6TH 2026 _ NOT FINAL ISSUANCE FOR CONSTRUCTION

    Lucia Mar Unified School District 19six Project No. 23039.01
    Fairgrove Elementary School DSA #: 03-124876
    FA Service Replacement
    Project Specification
    provided such occupancy does not interfere with completion of the Work. Such placement of
    equipment and partial occupancy shall not constitute acceptance of the total Work.
    Architect will prepare a Certificate of Substantial Completion for each specific portion of
    the Work to be occupied before Owner occupancy.
    Obtain a Certificate of Occupancy from authorities having jurisdiction before Owner
    occupancy.
    Before partial Owner occupancy, mechanical and electrical systems shall be fully
    operational, and required tests and inspections shall be successfully completed. On
    occupancy, Owner will operate and maintain mechanical and electrical systems serving
    occupied portions of building.
    On occupancy, Owner will assume responsibility for maintenance and custodial service for
    occupied portions of building.
    SPECIFICATION FORMATS AND CONVENTIONS
    Specification Format: The Specifications are organized into Divisions and Sections using CSI's
    MasterFormat numbering system.
    Section Identification: The Specifications use Section numbers and titles to help with cross
    referencing in the Contract Documents. Sections in the Project Manual are in numeric
    sequence; however, the sequence is incomplete because all available Section numbers are
    not used. Consult the table of contents at the beginning of the Project Manual to
    determine numbers and names of Sections in the Contract Documents.
    Division 1: Sections in Division 1 govern the execution of the Work of all Sections in the
    Specifications.
    Specification Content: The Specifications use certain conventions for the style of language and the
    intended meaning of certain terms, words, and phrases when used in certain situations. These
    conventions are as follows:
    Abbreviated Language: Language used in the Specifications and other Contract
    Documents is abbreviated. Words and meanings shall be interpreted as appropriate.
    Words implied, but not stated, shall be inferred as the sense requires. Singular words shall
    be interpreted as plural, and plural words shall be interpreted as singular where applicable
    as the context of the Contract Documents indicates.
    Imperative mood and streamlined language are generally used in the Specifications.
    Requirements expressed in the imperative mood are to be performed by Contractor.
    Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity
    to describe responsibilities that must be fulfilled indirectly by Contractor or by others when
    so noted.
    a. The words "shall," "shall be," or "shall comply with," depending on the context, are
    implied where a colon (:) is used within a sentence or phrase.
    STORM WATER POLLUTION PREVENTION PLAN (SWPPP)
    The contractor shall submit a Storm Water Pollution Prevention Plan for approval by the City's
    Public Works and Community Development Departments. The plan shall show erosion control
    measures and indicate locations of staging, fueling, equipment and employee parking, and
    storage/stockpile locations. Locations for concrete washout shall be shown, as well as gravel site
    entrances and/or metal grates to keep soil from being deposited on City streets. The plan shall
    PROJECT SUMMARY 01 10 00 - 6
    BID SET 01 _ AUGUST 6TH 2026 _ NOT FINAL ISSUANCE FOR CONSTRUCTION

    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    Bid Solicitation # HR-24-380 Bid Solicitation # HR-24-380 Organization Name City of Long

    City of Long Beach

    Bid Due: 10/07/2026

    DPW | AN Civil Engineering Services 2026 Events Search Event : SFGOV-0000011866

    City and County of San Francisco

    Bid Due: 9/30/2026

    Chiller Replacement at Linus Pauling The project includes: The replacement of four rooftop

    Contra Costa County

    Bid Due: 10/21/2026

    RFQ - Inspection of Fire Life Safety Equipment Contractor shall inspect and/or test

    Marin Water

    Bid Due: 9/25/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.