| Location: | New York |
|---|---|
| Posted: | Feb 25, 2021 |
| Due: | Dec 31, 2025 |
| Agency: | State Government of New York |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
NYSERDA’s Bulk Storage Incentive program provides financial support for new energy storage systems over 5 megawatts (MW) of power measured in alternating current (AC) that provide wholesale market energy, ancillary services, and/or capacity services. Systems may be interconnected at the transmission, sub-transmission, or distribution level and may provide distribution services in addition to wholesale services. Incentive funds will be deployed through a NYSERDA-administered declining incentive. These incentives are designed to compensate for benefits accruing over a 20-year life of the storage asset such as cost savings resulting from reducing soft costs and accelerating the cost decline curve, environmental benefits such as carbon savings (peak/off-peak arbitrage by charging from cleaner energy off-peak to displace the need for more emitting fossil-based generation during peak periods), hosting capacity improvements, and improving system resiliency. This 20-year life includes augmentation as required of the storage technology. Applications will be accepted through December 31, 2025.
|

With GovernmentContracts, you can:
...02 Title: Electrical Energy Power Generation Equipment with Related Parts, Supplies, and Services...
The New York State Contract Reporter
Bid Due: 6/23/2026
...08 Title: Generation Control System and Sub-systems Upgrades - STL CR#: 2134277 Agency: ...
The New York State Contract Reporter
Bid Due: 6/22/2026
...distribution network and constructing a facility capable of 8MW of power generation needed ...
DEPT OF DEFENSE
Bid Due: 6/12/2026
...and commissioning. Additionally, all necessary utility interconnections to bring fuel to the power ...
DEPT OF DEFENSE
Bid Due: 6/19/2026