| Location: | California |
|---|---|
| Posted: | Jul 2, 2026 |
| Due: | Jul 20, 2026 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Improvements for this project will generally include cold planing existing pavement, aggregate base and soil to shape subgrade to finish grade slopes, re-compaction of existing base material,hot mix asphalt paving, road widening, soldier pile and timber lagging retaining wall, signage and striping, concrete curb and median, subdrain system, and minor drainage improvements. The work will take place on Point Reyes – Petaluma Road in Nicasio.
See ENG 41EG2020 Point Reyes-Petaluma at Nicasio Valley Road Turn Pocket for full details.

With GovernmentContracts, you can:
.... The project includes full depth roadway reconstruction, concrete improvements, and traffic safety... ...
Coalinga city
Bid Due: 7/21/2026
...installation, concrete pour and finish work, AC conforms, building anchorage installation) Remove... Project ...
City of Santa Cruz
Bid Due: 7/29/2026