| Location: | South Carolina |
|---|---|
| Posted: | Feb 4, 2026 |
| Due: | Mar 10, 2026 |
| Agency: | County of Spartanburg |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Number | Deadline |
|
2026052
RFP# 2026052 SPARTANBURG COUNTY BALLENGER ROAD CULVERT EXTENSION PROJECT.
This project extends the existing culvert out an additional 8 feet on each side to add road shoulder and guard rail. Work includes tree cutting, clearing and grubbing, muck removal, earthwork cut and fill, culvert extension, rip rap, sediment and erosion control, grass and matting, installation of new guard rail. The existing pavement is in excellent condition and must be protected during construction. |
03/10/2026 03:00 PM UTC |

With GovernmentContracts, you can:
...* Installation of erosion and sedimentation control facilities A non-mandatory pre-bid conference will ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/30/2026
...and erosion control measures. Pre-Bid Information: Optional Pre-Bid Meeting held at Lower Reedy ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/28/2026
...and wood habitat and stabilization structures, erosion and sediment control measures, and establishment...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/19/2026
...sidewalks, and concrete curb and gutter; installation of temporary and permanent erosion control..., ...
City of Charleston
Bid Due: 8/07/2026