| Location: | California |
|---|---|
| Posted: | Oct 13, 2024 |
| Due: | Nov 13, 2024 |
| Agency: | City of Thousand Oaks |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: MI 2612- Digester Roof Caulking Project
Addenda: 0
Release Date: 10/11/2024
Due Date: 11/13/2024
The Work to be performed under this Contract shall consist of furnishing all plant, tools, equipment, materials, labor, supplies, and manufactured articles for the Project. It shall also include the furnishing of all transportation and services, including fuel, power, water, and essential communications, and for the performance of all labor work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents.
The Work consists of removal of all existing roof perimeter caulking on the three digester units (1, 2, and 3), preparation of the existing substrate (either concrete or steel in the case of Digester 1) in accordance with the manufacturer's instructions, installation of the required backer rod and bond breaker tape, installation of the required backer rod and bond breaker tape, installation of the required primer and caulking sealant and cleanup as necessary.
The Work to be construction is located at the Hill Canyon Treatment Plant (9600 Santa Rosa Road, Camarillo, CA 93012).

With GovernmentContracts, you can:
...Boiler and Cooling Towers Water Treatment Status Stage Open Posted 5/26/2026 Bid Due ...
City of Los Angeles
Bid Due: 6/18/2026
...Water Treatment Plant Residual Solids Removal and Disposal Department: Operations, Finance....), hereby gives ...
El Dorado Irrigation District
Bid Due: 7/08/2026
...Project ID: 2026-RFB-0054 Title: Vineyard Surface Water Treatment Plant -Sludge Removal Addenda: 0... ...
Sacramento County
Bid Due: 6/26/2026
...Bid Number: CIP-10-026 Bid Title: DRY CREEK WATER TREATMENT PLANT UPGRADES PROJECT WA008 ...
City of Healdsburg
Bid Due: 7/09/2026