| Location: | Texas |
|---|---|
| Posted: | Jun 8, 2025 |
| Due: | Jun 25, 2025 |
| Agency: | Hidalgo County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | HCDD1-25-036-05-27-ESZ |
| Publication URL: | To access bid details, please log in. |
Project ID: HCDD1-25-036-05-27-ESZ
Title: La Villa/Edcouch/Elsa Phase II, IBWC Structure 603AL -2023 Bond Project No. 8.2
Addenda: 0
Release Date: 6/7/2025
Due Date: 6/25/2025
RELEASE DATE: Saturday, June 7, 2025
RESPONSE SUBMISSION DATE/TIME: Wednesday, June 25, 2025 , 9:30 am
RE: HIDALGO COUNTY DRAINAGE DISTRICT NO.1 - REQUEST FOR BIDS
RFB NO.: HCDD1-25-036-05-27-ESZ – La Villa/Edcouch/Elsa Phase II, IBWC Structure 603AL -2023 Bond Project No. 8.2
To Whom It May Concern:
Enclosed please find the procurement packet for your review and consideration. Hidalgo County Drainage District No. 1 welcomes and appreciates your participation in the procurement process. If any further assistance is required, please do not hesitate to call Hidalgo County Drainage District No. 1 Office at (956) 292-7080.
Sincerely,
Hidalgo County Drainage District No.1
Enriqueta Zambrano , Procurement Manager
The project is located near FM 491 and Mile 14 ½ Road in Hidalgo County, Texas at the IBWC Levee. The project includes construction of a new pump and gate structure south of the existing dual 5'x5' box culverts. Improvements consist of a 9'x5' cast-in-place box with a permanent vertical pump, a 5'x5' cast-in-place box with a sluice gate, and an 8'x8' cast-in-place outfall box. Additional work includes ditch realignment, energy dissipators, concrete riprap, erosion control, and a pre-engineered metal canopy. All work will follow HCDD1 and IBWC design standards and specifications. This project is approximate 180 construction days with an estimated cost rage from $2.1M – $2.2M

With GovernmentContracts, you can: